Pasar al contenido principal
Southern California Edison Southern California Edison
  • Interrupciones y seguridad
  • Interrupciones y seguridad
    • Informar de un corte o problema de seguridad
      • Notificar interrupción
      • Reportar una línea eléctrica caída
      • Reportar avería en el alumbrado público
    • Centro de interrupciones
      • Check Outage Status
      • Recibe alertas
      • Our Service Guarantee
    • Preparación para cortes
      • Consejos para interrupciones
      • Programa de baterías de respaldo para cuidados críticos
      • Sistema de Almacenamiento de Energía en Baterías (BESS)
      • Tipos de interrupción
    • Seguridad del suministro eléctrico
      • Outdoor Tips
      • Your Family's Safety
      • Power Lines & Trees
      • Protéjase de las estafas
    • Recursos y apoyo de seguridad
      • Apoyo durante emergencias
      • Necesidades funcionales y de acceso
      • Community Resource Center
      • Ubicaciones de los centros de enfriamiento
      • Soluciones de energía de respaldo
      • Capacitación y educación
    • Medidas de seguridad contra incendios forestales
      • Wildfire Mitigation Efforts
      • El clima y la detección de incendios
      • Safety-Related Planned Outages
      • Wildfire Communications Center
      • Instalaciones críticas e infraestructura crítica
      • Grid Hardening
  • Save Money
  • Save Money
    • Programas de ingresos calificados
      • CARE y FERA
      • Programa de Asistencia para el Ahorro de Energía
      • Arrearage Management Plan
    • Reembolsos y ayuda financiera
      • Programas de ayuda para el pago de facturas
      • Reembolsos y mercado de SCE
    • Programas de ahorro
      • Formas de ahorrar en casa
      • Inscríbete en programas de ahorro
      • Controlar las facturas
    • Rates & Financing
      • Residential Rate Plans & Details
      • Herramienta de comparación de planes de tarifas
      • Electric Vehicle Plans
      • Tarifas multifamiliares y facturación
      • Aviso de tarifas de SCE
  • Energía limpia y eficiente
  • Energía limpia y eficiente
    • Efficiency at Home
      • Benefits of an Electric Home
      • Energy Efficiency Financing
      • Energy Management Center
      • Guía de eficiencia del hogar
      • Clean Energía y Tú
      • Community Renewables Program
    • Electric Vehicles
      • Getting Started
      • EV Rebates & Rates
      • Charging Your EV
      • EVs for Business
    • Solar - Generating Your Own Power
      • Conceptos básicos de energía solar
      • Programa de Incentivos para la Autogeneración
      • Billing & Incentives
    • Energy Education
      • Class Categories & Descriptions
      • Education & Experience Centers
      • Foodservice Technology Center
      • Technology Test Center
    • Workforce Development
      • Career Insights
      • Education Programs
      • Financial Support
      • Job Resources
      • Research & Resources
      • Training
  • Para empresas
  • Para empresas
    • Smart Energy & Solar
      • Solar for Business
      • EVs for Business
      • Energy Efficiency Programs
    • Save Costs & Energy
      • Savings Strategies for Businesses
      • Enroll in Cost Savings Programs
      • Economic Development Assistance
      • Savings By Business Type
    • Rates & Financing
      • Planes de tarif. para empresas
      • Rate Comparison Tool
      • Energy Efficiency Financing Options
    • Business Community Resources
      • Business Resources
      • Business Consulting Services
      • Energy Education Centers
      • Workforce Development
search icon
avatar-icon avatar-icon
My Account
Login / Register with SCE.com to pay your bills, check your usage, and much more!

New to SCE.com?

Registro
Hi, John
My Dashboard
Log Out
  • My Account
    • My Account
      • Bills & Usage
      • Payments
      • Account Settings
    • Rate Plans
      • Planes para el tiempo de uso
      • Plan de tarifas escalonadas
      • Discontinued Plans
    • Construction & Renovation
      • Submit a New Request
      • Project Portal
      • SCE Project Center
    • Asistencia con las facturas y ahorros
      • Ayuda con la factura por única vez
      • Progs. de ingresos calificados
      • Hogares que dependen de equipos médicos
    • Centro de Atención al Cliente
      • Billing & Payments
      • Move Center
      • Community Choice Aggregation
      • Help Center
      • Claims, Forms & Requests
Turn-Key Installation
  • Para empresas
  • / Smart Energy & Solar
  • / Charge Ready Program
this element added for skip to main content issue fixes

Program Overview

Multi-family housing properties located in designated Disadvantaged Communities may qualify to have SCE design, purchase, install, and operate EV charging equipment at their site using program funds. Participants will still be responsible for paying the associated utility bill, but any fees charged for the use of the stations will help to reduce those costs.

Program Highlights:

  • SCE will leverage program funds to design, install, operate, and maintain the EV charging stations at no additional cost to the program participant. Participants would still be responsible for paying the associated utility bill, but any fees charged for the use of the stations will help to reduce those costs.
  • First of its kind for multi-family properties in designated Disadvantaged Communities (DAC)
  • This program is fully subscribed and is no longer accepting applications.

 

How It Works

Our Turn-Key Installation program is available to multi-family housing properties located in a designated qualifying Disadvantaged Community and provides full-service EV charging station installation, operation, and maintenance. This first of its kind program offering from SCE makes installing EV charging equipment completely hassle-free.

 

Eligibility Requirements

We’re here to help you save big with the Turn-Key Installation program. Qualifying non-governmental sites must also be located within SCE’s service territory and a customer of SCE.

Participant must enroll in a Time-Of-Use (TOU) rate plan, a qualifying Demand Response Program, and must also share pricing and usage data with SCE.

 

help icon

Turn-Key Installation Preguntas Frecuentes

Turn-Key Installation FAQ

Yes, the Turn-Key Installation program was specifically designed for multi-family property sites located in top-quartile Disadvantaged Communities.

Multi-family properties are residential properties that are designed to accommodate two or more tenants with shared parking areas. Multi-family properties include the following and will be eligible for applicable multi-family rebates or program offerings:

  • Apartment Buildings: Structure(s) containing two or more dwelling units that may also include common areas and facilities, e.g., entrances, lobby, elevators or stairs, mechanical space, walks, grounds, recreational facilities, and parking both covered and open.
  • Retirement Communities, Townhomes, Condominiums: Residential communities with shared parking areas managed by an HOA or an equivalent association.
  • Mobile Home Parks: Residential mobile home communities with shared parking areas.
  • University & Military Housing: Student or military housing units or apartments with individual cooking facilities (except conventional dormitories and barracks with cafeteria-type kitchens).
  • Timeshares: Vacation property communities with shared parking areas managed by an HOA or an equivalent association.
  • Public Parking with Dedicated Overnight Resident Passes: Public parking lots designated for nearby multi-family residents for overnight parking. Stations can be open for public use during daytime hours.

Unlike Level 1 (L1), L2 requires a professionally installed charging station that can be hard-wired, or a cord set compatible with a 208/240-volt outlet. Charging at this level is much faster than L1, making it an attractive choice for many property owners and operators.

Top qualifying Disadvantaged Communities are designated by CalEPA with a standardized set of energy distribution variables such as geographic location, exposure to environmental hazards, economic opportunities, and more. To learn more about the top quartile Disadvantaged Community designation and see if you’re in one, view the Disadvantaged Community Map.

Staying ahead of the curve is vital for business and organization leaders of all kinds. As California moves to achieve its 2035 carbon-neutral goals, the wide-scale adoption of electric vehicles will play a vital role. Expanding the availability of EV charging station locations will help to support the existing and continued growth of the EV marketplace and position your business' ability to better meet your customers’ needs. 

Read Pathway 2045

The shifting landscape translates to opportunities for owners and operators of multi-family housing property sites to attract and retain tenants. Find out how other businesses have found success with Charge Ready.

Interested in applying for Charge Ready?

If you think Charge Ready may benefit your business or organization, start your online application today. Click Here.
Charge Ready Rebate Programs
  • Charging Infrastructure & Rebate Program
  • Direct Current Fast Charging (DCFC) Program
  • New Construction Rebate Program
  • Small Site Rebate Program

 

Want more information?

We’re excited to work with decision makers like you who are interested in the Charge Ready program offerings and supporting this landmark EV movement. Tell us about your property’s needs to learn more about SCE’s suite of EV charging station program offerings that may work for you.

CNT Properties Charging Stations

Charge Ready Case Studies

Read case studies from successful Charge Ready customers.
Learn More
Idioma:
  • English
  • ESPAÑOL
  • 한국어
  • 中文
  • TIẾNG VIỆT
  • Tagalog
  • عربى
  • հայերեն
  • فارسی
  • Français
  • Deutsch
  • 日本語
  • ខ្មែរ
  • ਪੰਜਾਬੀ
  • русский
  • Português
  • हिंदी
  • Hmong
  • Thai

Acerca de SCE

  • Gobierno corporativo
  • Donaciones a la comunidad
  • Medioambiente
  • Fiabilidad
  • Adquisición de energía
  • Información regulatoria
  • Procedimientos de la CPUC con notificación abierta
  • Accesibilidad

Partners

  • Proveedores de energía de terceros
  • Desarrolladores y Constructores
  • Recursos
  • Servicios de consultoría
  • Installation Management Services (Telecom)
  • Power Capacity and Availability

Centro de Atención al Cliente

  • Facturación y pagos
  • Centro de Mudanza
  • Centro de ayuda
  • Construction & Renovation
  • Submit Claims, Forms & Requests
  • Conservación de energía
  • Programa Community Choice Aggregation
  • Catalina Island Utility Services
  • Edison International
  • ENERGIZED by Edison
  • Sala de prensa
  • Carreras profesionales
  • Facebook
  • Instagram
  • X
  • LinkedIn
  • YouTube
Southern California Edison
header line
Energy for What's Ahead ®
Términos y condiciones
Aviso de privacidad
Personal Information Request
Ley de Derechos de Autor

©  copyright Southern California Edison