Pasar al contenido principal
Southern California Edison Southern California Edison
  • Interrupciones y seguridad
  • Interrupciones y seguridad
    • Informar de un corte o problema de seguridad
      • Notificar interrupción
      • Reportar una línea eléctrica caída
      • Reportar avería en el alumbrado público
    • Centro de interrupciones
      • Check Outage Status
      • Recibe alertas
      • Our Service Guarantee
    • Preparación para cortes
      • Consejos para interrupciones
      • Programa de baterías de respaldo para cuidados críticos
      • Sistema de Almacenamiento de Energía en Baterías (BESS)
      • Tipos de interrupción
    • Seguridad del suministro eléctrico
      • Outdoor Tips
      • Your Family's Safety
      • Power Lines & Trees
      • Protéjase de las estafas
    • Recursos y apoyo de seguridad
      • Apoyo durante emergencias
      • Necesidades funcionales y de acceso
      • Community Resource Center
      • Ubicaciones de los centros de enfriamiento
      • Soluciones de energía de respaldo
      • Capacitación y educación
    • Medidas de seguridad contra incendios forestales
      • Wildfire Mitigation Efforts
      • El clima y la detección de incendios
      • Safety-Related Planned Outages
      • Wildfire Communications Center
      • Instalaciones críticas e infraestructura crítica
      • Grid Hardening
  • Save Money
  • Save Money
    • Programas de ingresos calificados
      • CARE y FERA
      • Programa de Asistencia para el Ahorro de Energía
      • Arrearage Management Plan
    • Reembolsos y ayuda financiera
      • Programas de ayuda para el pago de facturas
      • Reembolsos y mercado de SCE
    • Programas de ahorro
      • Formas de ahorrar en casa
      • Inscríbete en programas de ahorro
      • Controlar las facturas
    • Rates & Financing
      • Residential Rate Plans & Details
      • Herramienta de comparación de planes de tarifas
      • Electric Vehicle Plans
      • Tarifas multifamiliares y facturación
      • Aviso de tarifas de SCE
  • Energía limpia y eficiente
  • Energía limpia y eficiente
    • Efficiency at Home
      • Benefits of an Electric Home
      • Energy Efficiency Financing
      • Energy Management Center
      • Guía de eficiencia del hogar
      • Clean Energía y Tú
      • Community Renewables Program
    • Electric Vehicles
      • Getting Started
      • EV Rebates & Rates
      • Charging Your EV
      • EVs for Business
    • Solar - Generating Your Own Power
      • Conceptos básicos de energía solar
      • Programa de Incentivos para la Autogeneración
      • Billing & Incentives
    • Energy Education
      • Class Categories & Descriptions
      • Education & Experience Centers
      • Foodservice Technology Center
      • Technology Test Center
    • Workforce Development
      • Career Insights
      • Education Programs
      • Financial Support
      • Job Resources
      • Research & Resources
      • Training
  • Para empresas
  • Para empresas
    • Smart Energy & Solar
      • Solar for Business
      • EVs for Business
      • Energy Efficiency Programs
    • Save Costs & Energy
      • Savings Strategies for Businesses
      • Enroll in Cost Savings Programs
      • Economic Development Assistance
      • Savings By Business Type
    • Rates & Financing
      • Planes de tarif. para empresas
      • Rate Comparison Tool
      • Energy Efficiency Financing Options
    • Business Community Resources
      • Business Resources
      • Business Consulting Services
      • Energy Education Centers
      • Workforce Development
search icon
avatar-icon avatar-icon
My Account
Login / Register with SCE.com to pay your bills, check your usage, and much more!

New to SCE.com?

Registro
Hi, John
My Dashboard
Log Out
  • My Account
    • My Account
      • Bills & Usage
      • Payments
      • Account Settings
    • Rate Plans
      • Planes para el tiempo de uso
      • Plan de tarifas escalonadas
      • Discontinued Plans
    • Construction & Renovation
      • Submit a New Request
      • Project Portal
      • SCE Project Center
    • Asistencia con las facturas y ahorros
      • Ayuda con la factura por única vez
      • Progs. de ingresos calificados
      • Hogares que dependen de equipos médicos
    • Centro de Atención al Cliente
      • Billing & Payments
      • Move Center
      • Community Choice Aggregation
      • Help Center
      • Claims, Forms & Requests
Charging Infrastructure Rebate
  • Para empresas
  • / Smart Energy & Solar
  • / Charge Ready Program
this element added for skip to main content issue fixes

Program Overview

Our Charging Infrastructure and Rebate Program offers step-by-step assistance for infrastructure upgrades and installation. This program provides the necessary infrastructure to support the installation of EV charging infrastructure at low- to no-cost to the program participant. Eligible properties will save money when participating in the program and installing four or more EV charging ports.

Program Highlights:

  • Provides program funded utility and customer-side of the meter distribution infrastructure upgrades.
  • For those property owners/managers choosing to install four or more EV charging station ports.

 

How It Works

Program Funded Design and Installation of Supporting Electrical Infrastructure

We are here to help by providing the infrastructure upgrades needed for EV charging equipment to those who qualify. Under this program, SCE provides utility distribution service upgrades to support the installation of EV charging equipment. The Charging Infrastructure and Rebate is comprised of two primary features.

  1. SCE will design, construct, and install the necessary infrastructure on both the utility-side and customer-side of the electric meter.
  2. Allows customers the option to design, purchase, and install the customer-side of the infrastructure work.

Additionally, multi-family housing properties located in a designated qualifying disadvantaged communities can apply are eligible for an additional Maintenance & Networking Rebate to help cover the cost of purchasing and managing the EV charging equipment.

 

Program Participation Requirements

If eligible, your business could benefit from participating in the Charging Infrastructure and Rebate Program. This program is available through 2026, or until available funding is fully subscribed. Participants are responsible for purchasing and installing all EV charging equipment and paying all EV charging station energy costs.

Select requirements include:

  1. Participant must operate and maintain the EV charging equipment for a 10-year duration.
  2. Installation of separate dedicated metering to measure EV charging station load and served by a Time-Of-Use (TOU) rate plan.
  3. Enrollment in a qualifying Demand Response program.
  4. The charging equipment must be equipped with a network service and the related usage and pricing information will be shared with SCE.

For additional eligibility and participation requirements, check our full Program Guidelines.

 

help icon

Charging Infrastructure & Rebate Program Preguntas Frecuentes

Charging Infrastructure & Rebate Program FAQ

If you are a business leader with multi-family property, commercial buildings (offices, retail, etc.), or in the public sector, you could be eligible to participate in the Charging Infrastructure and Rebate Program. More eligibility and participation requirements can be found in the How It Works section and in our Quick Reference Guide.

There are two primary segments of supporting electrical infrastructure work typically required for the installation of banks of EV charging equipment. This supporting infrastructure work is sometimes referred to as “make-ready” and includes:

  1. The utility side of the meter infrastructure work, which includes all infrastructure from SCE’s distribution system to a new circuit panel that will be installed to support EV charging. This segment of work is also referred to as the utility-side make-ready. SCE will always be responsible for designing, procuring, installing, and maintaining the necessary infrastructure located on the utility side of the meter.

    Included with the utility-side infrastructure work, SCE will set an interval data recording (IDR) meter to capture EV charging equipment consumption data. The meter will track usage in 15-minute increments and may also be used for billing purposes.

  2. The customer side of the meter infrastructure work, which includes all infrastructure from the new panel that will be set as part of the utility-side infrastructure work, up to the first point of interconnection with the participant’s EV charging equipment. All participants will have the option to have SCE perform the customer-side infrastructure work (also referred to as the customer-side make-ready) at no additional cost to the participant, or alternatively, may choose to design, procure, install, and maintain the customer-side make-ready infrastructure themselves and qualify to receive a rebate of up to 80% of the estimated costs SCE would incur for performing the work.

Multi-family housing stakeholders can choose from three different levels of EV charging stations:

Level 1 (L1): All plug-in EVs come with an L1 charging cord that plugs directly into a standard 120-volt outlet. Charging typically gives about 5 miles of range per hour of charging.

Level 2 (L2): This level requires a professionally installed charging station that can be hard-wired, or a cord set compatible with a 240-volt outlet. L2 stations can provide 26 or more miles of driving range per hour of charge. Charging at this level is faster, making it a versatile choice for many properties.

Direct Current Fast Charging (DCFC): This is the fastest type of EV charging station commonly used, providing up to 40 miles of range for every 10 minutes of charging. DCFC is a good fit for locations where drivers need to recharge quickly to get to their destination. Though not available now, DCFC will soon be available as an additional option to L1 and L2 equipment.

Meeting your customers’ needs is vital for business and organization leaders of all kinds. As California moves to achieve its 2035 carbon-neutral goals, the wide-scale adoption of electric vehicles will play a vital role. Expanding the availability of EV charging station locations will help to support the existing and continued growth of the EV marketplace and position your business's ability to better meet your customers’ needs. Read Pathway 2045

The shifting landscape translates to opportunities for owners and operators of multi-family property sites seeking to attract and retain tenants. Find out how other businesses have found success with Charge Ready.

Interested in applying for Charge Ready?

If you think Charge Ready may benefit your business or organization, start your online application today. Click Here.
Charge Ready Rebate Programs
  • Direct Current Fast Charging (DCFC) Program
  • New Construction Rebate Program
  • Small Site Rebate Program
  • Charge Ready Turn-Key Installation

 

Want more information?

We’re excited to work with decision makers like you who are interested in the Charge Ready program offerings and supporting this landmark EV movement. Tell us about your property’s needs to learn more about SCE’s suite of EV charging station program offerings that may work for you.

CNT Properties Charging Stations

Charge Ready Case Studies

Read case studies from successful Charge Ready customers.
Learn More
Idioma:
  • English
  • ESPAÑOL
  • 한국어
  • 中文
  • TIẾNG VIỆT
  • Tagalog
  • عربى
  • հայերեն
  • فارسی
  • Français
  • Deutsch
  • 日本語
  • ខ្មែរ
  • ਪੰਜਾਬੀ
  • русский
  • Português
  • हिंदी
  • Hmong
  • Thai

Acerca de SCE

  • Gobierno corporativo
  • Donaciones a la comunidad
  • Medioambiente
  • Fiabilidad
  • Adquisición de energía
  • Información regulatoria
  • Procedimientos de la CPUC con notificación abierta
  • Accesibilidad

Partners

  • Proveedores de energía de terceros
  • Desarrolladores y Constructores
  • Recursos
  • Servicios de consultoría
  • Installation Management Services (Telecom)
  • Power Capacity and Availability

Centro de Atención al Cliente

  • Facturación y pagos
  • Centro de Mudanza
  • Centro de ayuda
  • Construction & Renovation
  • Submit Claims, Forms & Requests
  • Conservación de energía
  • Programa Community Choice Aggregation
  • Catalina Island Utility Services
  • Edison International
  • ENERGIZED by Edison
  • Sala de prensa
  • Carreras profesionales
  • Facebook
  • Instagram
  • X
  • LinkedIn
  • YouTube
Southern California Edison
header line
Energy for What's Ahead ®
Términos y condiciones
Aviso de privacidad
Personal Information Request
Ley de Derechos de Autor

©  copyright Southern California Edison