Please sign up to receive e-mails about the Lundy Project using our Contact Registration Form.
Below are links to project-related materials, notifications, and documentation (provided as PDFs). All documents related to the Lundy Project can also be found on FERC’s eLibrary. This page will be updated throughout the relicensing process as new materials become available or are updated.
Register online here to be notified via e-mail of new FERC filings and issuances related to the Lundy Project. Follow the online instructions and subscribe to docket number P-1390.
Take a virtual tour of the Lundy Canyon Hydroelectric Project and the surrounding areas of Lundy Lake, and the Lundy Canyon Campground for recreation, camping, and fishing.
Relicensing Documents
Project Description & Informational Materials
FERC Issued Documents
Pre-Application Document
On February 23, 2024, Southern California Edison Company filed with the Federal Energy Regulatory Commission (FERC) its formal Notice of Intent (NOI) to file an Application for New License for the Lundy Hydroelectric Project (FERC No. P-1390) and a Pre-Application Document (PAD). These documents were e-filed with FERC and are accessible through FERC’s eLibrary or available for download below. If you encounter any issues accessing or downloading files, please contact Matt Woodhall at 626-302-9596 or matthew.woodhall@sce.com
Study Planning
Initial Study Report
Documents anticipated by November 2025.
Updated Study Report
Documents anticipated by November 2026.
Draft License Application (DLA)
Documents anticipated by October 2026.
Final License Application (FLA)
Documents anticipated by February 2027.
Upcoming Public Meetings
No upcoming meetings are scheduled at this time.
Past Public Meetings
Meetings Notes and Presentations:
- May 14-15, 2024 – FERC Scoping Meeting/Environmental Site Visit
- December 5, 2023 - Introduction to Relicensing
- September 3, 2024 - Proposed Study Plan Meeting
Reference Documents
Original License Order and Amendments
Contact Us
Name | Company | Project Role | Address | Phone | |
---|---|---|---|---|---|
Wayne Allen | SCE | Principal Manager | 1515 Walnut Grove Ave. Rosemead, CA 91770 | wayne.allen@sce.com | 626-302-9741 |
Matthew Woodhall | SCE | Project Lead | 1515 Walnut Grove Ave. Rosemead, CA 91770 | matthew.woodhall@sce.com | 626-302-9596 |
Jess Fefer | FERC | FERC D.C. | jessica.fefer@ferc.gov | 202-502-6631 | |
Lyle Laven | SCE | Production Manager Eastern Operations (Bishop/Mono Basin) | Bishop Hydro Offices Plant 4 Bishop CA 93514 | lyle.laven@sce.com | 760-873-0724 |
- Big Creek Hydro Licensing
- Bishop Creek Project Relicensing
- Borel Project Surrender (FERC P-382)
- Kaweah Hydroelectric Project Relicensing
- Kern River No. 1 Project Relicensing (FERC No. 1930)
- Kern River No. 3 Hydroelectric Project (FERC No. 2290)
- Lee Vining Hydroelectric Project (FERC No. P-1388)
- Rush Creek Project Relicensing (FERC P-1389)
- FERC Standards of Conduct
- Regulatory Information - Santa Catalina Gas Water Tariffs
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification