Please sign up to receive e-mails about the Project using our Contact Registration Form.
Below are links to project-related materials, notifications, and documentation (provided as PDFs). All documents related to the Bishop Creek Project can also be found on FERC’s eLibrary. This page will be updated throughout the relicensing process as new materials become available or are updated.
Register online here to be notified via e-mail of new FERC filings and issuances related to the Bishop Creek Project.
Final License Application Filed June 29, 2022
SCE has filed the Final License Application (FLA) for the relicensing of the Bishop Creek Hydroelectric Project (Federal Energy Regulatory Commission [FERC] Project No. 1394). The filing includes exhibits that describe the project and environmental conditions within the project area. Pursuant to 18 Code of Federal Regulation (CFR) 5.16(c), this FLA presents SCE's proposal for future operations, and associated environmental measures. The FLA filing is provided on this webpage and also may be accessed on FERC's public website under docket P-1394 at https://elibrary.ferc.gov/eLibrary/docinfo?accession_number=20220502-5355.
Relicensing Documents
Pre-Application Document
On May 1, 2019, Southern California Edison Company filed with the Federal Energy Regulatory Commission (FERC) its formal Notice of Intent (NOI) to file an Application for New License for the Bishop Creek Project (FERC Project No. 1394) and a Pre-Application Document (PAD). These documents were e-filed with FERC and are available through FERC’s eLibrary or available for download below. If you have difficulty accessing or downloading files please contact Matt Woodhall at 626-302-9596 or matthew.woodhall@sce.com
.
- Volume I
- Volume II – Summary of Contacts
- Appendix A – Charter
- Appendix B – Distributed Material (available at FERC eLibrary)
- Volume III Technical Study Plans (originally filed May 1, 2019; superseded by August 29 filing)
- Comments on Scoping Document 1 and Study Requests (August 29, 2019)
Study Plan Determination
- SCE request for expedited study plan determination: On September 4, 2019, SCE filed a letter requesting a waiver of sections 5.11 and 5.12 of the FERC’s regulations to expedite the study plan process. The waiver was intended to shorten the study plan determination process by four months to provide more time for SCE and the stakeholders to collaboratively assess project effects and develop proposed license conditions during the pre-filing period. On October 3, 2019, FERC staff granted the waiver request and established a deadline of October 18, 2019, for stakeholders to file comments on the RSP. No comments on the revised study plan were filed.
- FERC Study Plan Determination: On November 4, 2019, SCE’s Revised Study Plan was approved, with one FERC staff-recommended modification (discussed in Appendix B).
Initial Study Report
The Initial Study Report (ISR) marks the 1-year anniversary of FERC’s study plan determination as required by 18 Code of Federal Regulation (CFR) 5.15(c). The ISR (1) describes overall progress in implementing the approved Study Plan, (2) provides an update on the schedule for implementing the studies, and (3) describes the data collected thus far. The ISR is not intended to analyze results for purposes of determining Project effects, nor does it discuss potential protection, mitigation, and enhancement (PME) measures. The ISR and associated meeting are intended to provide an opportunity to review progress in implementing the approved study plans and provide an opportunity for stakeholders to suggest modification or additional areas of inquiry that are needed to have an informed discussion of Project effects.
Updated Study Report
Draft License Application (DLA)
Pursuant to 18 CFR § 5.18, SCE filed the DLA with FERC on January 27, 2022. The DLA discusses SCE’s proposal for continued maintenance and operation of the Project.
- DLA Cover Letter
- Volume 1:
- Initial Statement, Exhibit A, B, C, D, F, G, H
- Exhibit E
- Note: Exhibit E includes the results of studies undertaken in support of the relicensing. Discussion in Exhibit E considers how the information and data collected during the studies addresses issues raised by agencies and other interested parties, and how the information collected informs SCE’s proposed Project operations. As appropriate, Exhibit E includes SCE’s preliminary proposals for protection, mitigation, and enhancement (PME) measures to address Project effects (ongoing and proposed) on environmental and social resources. SCE intends to continue discussing PME measures with stakeholders after the filing of the DLA and will include final measures, including any proposed management plan as part of the Final License Application (FLA).
- Volume 2: Exhibit E Appendices
- Volume 3: Technical Reports
Technical Working Groups Documents
Background Materials & Meeting Agendas
2018
- March 15, 2018, Stakeholder Meeting Agenda
- Technical Work Group Charter
- Technical Working Group Study Plan Schedule & Study Plan Determination Milestones
- Literature List
- June 4, 5, & 7 Meeting Agenda
- June 2018 TWG Introductory Memo
- Project Description
- Current and Proposed Project Operations
- Project Mapbook
- July Oversight Committee Agenda
- August 2018 TWG Memo
- November 2018 TWG Memo
2019
2020
2021
2022
- May 25, 2022, PM&E Meeting Agenda
- May 18, 2022, PM&E Meeting Agenda
- May 3, 2022, PM&E Meeting Agenda
- April 27, 2022, PM&E Meeting Agenda
- March 30, 2022, PM&E Meeting Agenda
- March 1, 2022, PM&E Meeting Agenda
Meeting Documentation
2018
- March 15, 2018, Stakeholder Meeting Summary Notes - Final
- April 3, 2018, Oversight Committee Meeting Summary Notes Final
- June 4, 5, & 7, 2018 Technical Working Group Meetings Summary Notes Final
- July 13, 2018, Oversight Committee Meeting Summary Notes Final
- August 14 & 15, 2018 Technical Working Group Meetings Summary Final
- October 9 & 10, 2018 Technical Working Group Meetings Summary Final
2019
- February 11, 2019, Oversight Committee Meeting Summary Final
- February 26, 2019, Aquatic Technical Working Group Webinar Summary Final
- February 27, 2019, Cultural Technical Working Group Webinar Summary Final
- June 11 & 19, 2019 Aquatics, Recreation, Botanical, and Terrestrial Technical Working Group Conference Calls Summary (Final)
2020
- May 2020 Technical Working Group Presentations (Aquatics, Sediment, Operations, Botanical, Recreation, & Wildlife Updates)
- May 2020 Technical Working Group Webinar Summaries (May 7th & 19th) (Final)
- November 10, 2020 Meeting Summary + Appendices
2021
- March 2021 Recreation TWG Meeting Summary
- September 3, 2021, Operations Model Workshop Summary
- October 6, 2021 Summary of meeting re: CDFW comments on Aquatic Study Reports
- October 26 & 28, 2021 Project Effects Meetings Summary
- November 4, 2021, Operations Model Meeting Summary
2022
- May 25, 2022, PM&E Meeting Summary
- May 18, 2022, PM&E Meeting Summary
- May 3, 2022, PM&E Meeting Summary
- April 27, 2022, PM&E Meeting Summary
- March 30, 2022, PM&E Meeting Summary
- March 1, 2022, PM&E Meeting Summary
Cultural Resources
- June 2018 Cultural Resources Technical Working Group Agenda
- August 2018 Cultural Resource Technical Working Group Agenda
- October 2018 Cultural Resource Technical Working Group Agenda
- February 2019 Cultural Resource Technical Working Group Agenda
Aquatic Resources
- June 2018 Aquatic Resources Technical Working Group Agenda
- August 2018 Aquatic Resource Technical Working Group Agenda
- October 2018 Technical Working Groups Agenda
- February 2019 Aquatic Resource Technical Working Group Agenda
- June 2019 Aquatic Resource Technical Working Group Agenda
- May 2020 Aquatic, Botanical, Wildlife, and Recreation Technical Working Group Agenda
- September 2020 Operations Model Workshop Agenda
Terrestrial & Botanical Resources
- June 2018 Terrestrial Resources Technical Working Group Agenda
- June 2018 Botanical Resources Technical Working Group Agenda
- August 2018 Botanical & Terrestrial Resources Technical Working Group Agenda
- October 2018 Technical Working Groups Agenda
- June 2019 Recreation, Botanical, and Terrestrial Working Groups Agenda
- May 2020 Aquatic, Botanical, Wildlife, and Recreation Technical Working Group Agenda
Recreation & Land Management Resources
- June 2018 Recreation Resources Technical Working Group Agenda
- August 2018 Recreation Resources Technical Working Group Agenda
- October 2018 Technical Working Groups Agenda
- June 2019 Recreation, Botanical, and Terrestrial Working Groups Agenda
- May 2020 Aquatic, Botanical, Wildlife, and Recreation Technical Working Group Agenda
Reference Documents
Original License Order and Amendments
Name | Project Role | Address | Phone |
---|---|---|---|
General Information | -- | -- | 800-257-1048 |
Wayne Allen SCE | Principal Manager | 1515 Walnut Grove Ave. Rosemead, CA 91770 | 626-302-9741 |
Matthew Woodhall SCE | Project Lead | 1515 Walnut Grove Ave. Rosemead, CA 91770 | 626-302-9596 |
Jess Fefer FERC | FERC D.C. | -- | 202-502-6631 |
Lyle Laven SCE | Production Manager Eastern Operations (Bishop/Mono Basin) | Bishop Hydro Offices Plant 4 Bishop CA 93514 | 760-873-0724 |
- Big Creek Hydro Licensing
- Borel Project Surrender (FERC P-382)
- Kaweah Hydroelectric Project Relicensing
- Kern River No. 1 Project Relicensing (FERC No. 1930)
- Kern River No. 3 Hydroelectric Project (FERC No. 2290)
- Lee Vining Hydroelectric Project (FERC No. P-1388)
- Lundy Hydroelectric Project (FERC No. P-1390)
- Rush Creek Project Relicensing (FERC P-1389)
- FERC Standards of Conduct
- Regulatory Information - Santa Catalina Gas Water Tariffs
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification