Hydro Licensing - Kern River No. 3 Project Relicensing
Draft License Application
Kern River No. 3 Project Draft License Application (Public Information)
Cover Letter and Distribution List
Volume I (public)
Initial Statement, Exhibits A, B, C, D, G, and H
Volume II (public)
- Exhibit E, Environmental Exhibit
- Exhibit E, Appendix E.1, Proposed Environmental Measures, Management Plans and Programs
- Exhibit E, Appendix E.2, Resource Technical Memorandum
- WR -1 Water Quality Interim Technical Memorandum (October 2023)
- WR-2 Hydrology Interim Technical Memorandum (October 2023)
- BIO-1 Foothill Yellow-legged Frog Interim Technical Memorandum (October 2023)
- BIO-2 Special-Status Salamanders Technical Memorandum (October 2023)
- BIO-3 General Wildlife Resources Technical Memorandum (October 2023)
- BIO-4 Benthic Macroinvertebrate Technical Memorandum (July 2024)
- BIO-5 Western Pond Turtle Technical Memorandum (October 2023)
- BIO-6 Stream Habitat Typing Technical Memorandum (October 2023)
- BOT-1 General Botanical Resources Technical Memorandum (October 2023)
- REC-1 Whitewater Boating Interim Technical Memorandum; (October 2023)
- REC-1 Whitewater Boating Level 1 Structured Interview Analysis (March 1, 2024)
- Addendum to REC-1 Whitewater Boating Interim Technical Memorandum: Level 3 Single Flow Survey Results (March 2024)
- REC-2 Recreation Facilities Use Assessment Interim Technical Memorandum (July 2024)
- REC-3 Existing Recreation Facilities Condition Assessment Technical Memorandum (October 2023)
- GEO-1 Erosion and Sedimentation Interim Technical Memorandum (October 2023)
- LAND-1 Road Condition Assessment Technical Memorandum (July 2024)
- OPS-1 Water Conveyance Assessment Interim Technical Memorandum (October 2023)
- Addendum to OPS-1 Water Conveyance Interim Technical Memorandum: Tunnel Stability (March 2024)
- AES-1 Aesthetic Flow Technical Memorandum (July 2024)
- ANG-1 Enjoyable Angling Flows Technical Memorandum (July 2024)
- EJ-1 Environmental Justice Interim Technical Memorandum (October 2023)
- 2023 Fish Population Study (March 2024)
- Exhibit E, Appendix E.3, Consultation Documentation
Hydro Licensing
- Big Creek Hydro Licensing
- Bishop Creek Project Relicensing
- Borel Project Surrender (FERC P-382)
- Kaweah Hydroelectric Project Relicensing
- Kern River No. 1 Project Relicensing (FERC No. 1930)
- Kern River No. 3 Hydroelectric Project (FERC No. 2290)
- Lee Vining Hydroelectric Project (FERC No. P-1388)
- Lundy Hydroelectric Project (FERC No. P-1390)
- Rush Creek Project Relicensing (FERC P-1389)
Related links
- FERC Standards of Conduct
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification