SCE is working to further reduce the risk of wildfire by burying power lines in high fire risk areas, especially where lines have not been replaced by covered conductor. SCE targets areas for undergrounding its power lines based on several considerations. The targeted undergrounding effort will make the electrical system more reliable during extreme weather conditions by protecting it from high winds, vegetation and other hazards that could cause fires or power outages.
Note: For undergrounding projects not related to wildfire mitigation, refer to Rule 20 undergrounding projects, which are initiated by a governmental agency (e.g., city, county), developer or individual customer.
Undergrounding Work Phases
Planning
During this phase, SCE planners and surveyors will conduct a feasibility assessment to help determine the scope of work that will take place in a selected community. They will gather data and make observations to analyze the viability of undergrounding electrical lines, which may include accessing and taking images of equipment and surrounding areas. This is a critical assessment to determine if this type of work can be completed at the proposed location.1 During the design phase, planners prioritize routes within public rights of way, but in some cases, limited access through private property (easements) may be needed.
Moving forward requires cooperation with property owners. Impacted property owners shall be informed about the upcoming project.
Permitting
Once the scope of work is established, SCE can determine if permitting is required. Most projects require at least one permit for road closures, typically from a city, county or Caltrans. Additional permit requirements depend on the project’s location. They may include state and federal land use permits, environmental clearances, or railroad rights-of-way permits. Permit approval may take as little as two months but could take significantly longer depending on individual project circumstances.
Construction
Work can be scheduled and construction can begin once all the required permits and necessary land rights are received.2 In most cases, this work will require a power outage at the end of construction, when the power is ready to be switched from the overhead to the underground lines. We will notify customers in advance if an outage is needed.
Undergrounding Work Status
Kern County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Flycatcher | Unincorporated Area (Mountain Mesa, Weldon) | 2026 |
Los Angeles County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Acapulco | Unincorporated | 2026 | ||||
| Arboretum | Arcadia | 2026 | ||||
| Avenida | Unincorporated Area (La Verne/ Claremont) | 2027 | ||||
| Brakeman | Rowland Heights | 2027 | ||||
| Clarinet | Unincorporated Area (Oak Flats, Ninetynine Oaks) | Anticipate starting construction in 2025 | Multiple Years | |||
| Cornwall | Unincorporated/ Whittier | 2027 | ||||
| Crummer | Agoura Hills | 2025 | ||||
| Cuthbert | Malibu, Unincorporated Area (Malibu Vista) | 2026 | ||||
| Devils Gate | Altadena | Expedited for fire rebuild | 2026 | |||
| Gorge | Altadena | Expedited for fire rebuild | 2025 | |||
| Guitar | Unincorporated, Santa Clarita | 2027 | ||||
| Hackberry | La Habra Heights | 2028 | ||||
| Haskell | La Canda Flintridge | 2029 | ||||
| Hillard | La Canda Flintridge | 2027 | ||||
| Horizon | Hidden Hills; Unincorporated | 2026 | ||||
| Horntoad | Calabasas, Unincorporated | 2026 | ||||
| Huckleberry | Palmdale, Unincorporated Area (Elizabeth Lake) | 2025 | ||||
| Kinneloa | Altadena | Expedited for fire rebuild | 2025/2026 | |||
| Kinsey | Unincorporated | 2027 | ||||
| Lamanda | Altadena | Expedited for fire rebuild | 2025/2026 | |||
| Maguire | Unincorporated | 2027 | ||||
| Mamba | Santa Clarita, Unincorporated | 2027 | ||||
| Maybell | Covina/ San Dimas | 2028 | ||||
| Merlin | Malibu, Unincorporated Area (Malibu Hills) | 2026 | ||||
| Milo | Calabasas | 2026 | ||||
| Mulholland | Unincorporated Area (Triunfo Canyon, Malibu Lake) | Started in 2024 | Multiple Years | |||
| Neargate | Santa Clarita | 2027 | ||||
| Nero | Santa Clarita | 2027 | ||||
| Nicholas | Malibu, Unincorporated | Expedited for fire rebuild | 2025 | |||
| Omega | La Habra Heights/Whittier | 2029 | ||||
| Orion | Santa Clarita, Unincorporated | 2027 | ||||
| Palmer | La Verne/ Claremont/ Unincorporated | 2025 | ||||
| Paloma | Altadena | Expedited for fire rebuild | 2026 | |||
| Payne | Bradbury | 2028 | ||||
| Paradise | Calabasas, Unincorporated Area (Topanga Park/Canyon) | 2026 | ||||
| Plateau | Calabasas, Unincorporated Area | 2026 | ||||
| Primrose | Monrovia | 2027 | ||||
| Python | Santa Clarita | Construction Complete | 2022 | |||
| Rhoda | Calabasas, Unincorporated Area | 2026 | ||||
| Robin/ Blue Ridge | Unincorporated, Big Pines | 2026 | ||||
| Rockhill | Hacienda Heights | 2027 | ||||
| Romanus | Unincorporated/ Near Santa Clarita | 2027 | ||||
| Seco | Altadena | Expedited for fire rebuild | 2025/2026 | |||
| Serra | Malibu, Unincorporated Area | 2026 | ||||
| Showdown | Palmdale | 2026 | ||||
| Sienna | Calabasa; Unincorporated | 2026 | ||||
| Stutz | Whittier | 2027 | ||||
| Tola | Altadena | Expedited for fire rebuild | 2026 | |||
| Triunfo | Agoura Hills/ Unincorporated Area | 2026 | ||||
| Tuna (Zuma) | Malibu, Unincorporated Area (Malibu Hills) | 2028 | ||||
| Veterans | Los Angeles, Unincorporated Area | 2026 | ||||
| Vicasa | Unincorporated Area (Topanga Canyon) | Started in 2024, Expedited for fire rebuild | Multiple Years | |||
| Whipstock | La Habra Heights/ Rowland Heights | 2028 |
Mono County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Pickle Meadows | Unincorporated Area (Near Sonora Junction) | 2027 |
Orange County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Acres | Laguna Beach, Unincorporated | 2027 | ||||
| Agate | Laguna Beach, Unincorporated | 2026 | ||||
| Artist | Laguna Beach, Unincorporated | 2026 | ||||
| Cortese | Laguna Beach | 2027 | ||||
| Kewamee | Laguna Beach, Unincorporated | 2026 | ||||
| Rubin | Irvine, Laguna Beach, Aliso Viejo | Anticipate starting construction in 2027-2028 | Multiple Years | |||
| Rustic | Unincorporated (near Rancho Santa Margarita) | 2027 |
Riverside County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Bohemia | Corona | Construction Complete | 2024 | |||
| Carancho | Unincorporated | Construction complete | 2025 | |||
| Cereal | Lake Elsinore, Unincorporated Area (Lake Elsinore) | Construction Complete | 2024 | |||
| Conestoga | Unincorporated/ near Temescal Valley | Anticipate starting construction in 2025 | Multiple Years | |||
| Dartmouth | San Jacinto, Unincorporated Area | Construction complete | 2025 | |||
| Granny Smith | Unincorporated (El Casco) | Construction complete | 2025 | |||
| Limited | Unincorporated | Construction Complete | 2024 | |||
| Stageline | Alberhill, Unincorporated | Construction complete | 2025 | |||
| Texfi | Jurupa Valley | Construction Complete | 2024 | |||
| Tin Mine/Mc Allister | Unincorporated Area (Lake Mathews) | Construction Complete | 2024 |
San Bernardino County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Abacus | San Bernardino | 2026 | ||||
| AllView | Running Springs | 2029 | ||||
| Big Falls | Forest Falls, Mountain Home Village | 2026 | ||||
| Boulder | San Bernardino/ Highland | 2025 | ||||
| Bryn Mawr | Redlands | Construction complete | 2025 | |||
| Butterfield | Chino Hills | Construction Complete | 2024 | |||
| Camp Angelus | Angelus Oaks | 2026 | ||||
| Circle | Wrightwood/ Unincorporated | Construction Complete | 2024 | |||
| Cram | San Bernardino, Unincorporated | 2026 | ||||
| Crump | Unincorporated (Forest Falls) | 2026 | ||||
| Del Carbon | Chino Hills | 2027 | ||||
| Fano | San Antonio Heights | Construction complete | 2025 | |||
| Hass | Mentone, Redlands, Unincorporated Area | 2026 | ||||
| Lark | Wrightwood | 2027 | ||||
| Mutual | Redlands | Construction complete | Multiple Years | |||
| Oak Glen | Oak Glen | 2027 | ||||
| Poultry | Forest Falls, Mountain Home Village | 2026 | ||||
| Poultry / Stonewood / Bear Valley | Yucaipa, Unincorporated Area | 2025 | ||||
| Santorini | Rancho Cucamonga | Construction Completed | 2025 | |||
| Stanwood | San Bernardino | 2027 | ||||
| Sutt | San Bernardino | Construction complete | 2025 | |||
| Tender | Chino Hills | 2026 | ||||
| Verdemont | Unincorporated | 2026 |
Santa Barbara County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Stanwood | Santa Barbara, Unincorporated | 2027 |
Tulare County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Success | Unincorporated Area (Soda Springs, Bagby Hill) | 2025 |
Ventura County (Updated as of 1/15/2026)
| CIRCUIT | COMMUNITIES | PLANNING | PERMITTING | CONSTRUCTION | NEXT STEPS | TARGET COMPLETION DATE |
|---|---|---|---|---|---|---|
| Academy | Thousand Oaks | 2027 | ||||
| Borchard | Thousand Oaks, Unincorporated | 2025 | ||||
| Dolphin | Unincorporated Area (Long Grade Canyon near CSU, Channel Islands) | Construction complete | 2025 | |||
| Hooligan | Thousand Oaks, Unincorporated Area (Hidden Valley) | 2025 | ||||
| Maguire | Unincorporated | 2027 |
Frequently Asked Questions
FAQ
- ਨਿਸ਼ਾਨਾਬੱਧ ਅੰਡਰਗਰਾਊਂਡਿੰਗ - ਜਨਰਲ
- Targeted Undergrounding - Permitting and Easements
- Targeted Undergrounding - Construction
- Targeted Undergrounding - Claims
ਅਜਿਹੀਆਂ ਸਥਿਤੀਆਂ ਵਿੱਚ ਜਿੱਥੇ ਬਿਜਲੀ ਦੀ ਲਾਈਨ ਜ਼ਮੀਨਦੋਜ਼ ਨਹੀਂ ਹੁੰਦੀ, SCE ਹੋਰ ਘਟਾਉਣ ਦੇ ਉਪਾਅ ਜਾਰੀ ਰੱਖੇਗਾ, ਜਿਵੇਂ ਕਿ ਨੰਗੀਆਂ ਤਾਰਾਂ ਨੂੰ ਢੱਕੇ ਹੋਏ ਕੰਡਕਟਰ ਨਾਲ ਬਦਲਣਾ। ਇਹ ਲਾਗਤ-ਪ੍ਰਭਾਵਸ਼ਾਲੀ ਅਤੇ ਤੇਜ਼ੀ ਨਾਲ ਇਗਨੀਸ਼ਨ ਜੋਖਮ ਨੂੰ ਘਟਾਉਣ ਲਈ ਸਭ ਤੋਂ ਕੀਮਤੀ ਸਾਧਨਾਂ ਵਿੱਚੋਂ ਇੱਕ ਹੈ, ਖਾਸ ਕਰਕੇ ਜਦੋਂ ਨਿਰੀਖਣ ਅਤੇ ਬਨਸਪਤੀ ਪ੍ਰਬੰਧਨ ਨਾਲ ਜੋੜਿਆ ਜਾਂਦਾ ਹੈ। SCE ਦੇ ਜੰਗਲੀ ਅੱਗ ਘਟਾਉਣ ਦੇ ਯਤਨਾਂ ਬਾਰੇ sce.com/mitigation 'ਤੇ ਹੋਰ ਜਾਣੋ।
ਵਰਤਮਾਨ ਵਿੱਚ, ਜੰਗਲੀ ਅੱਗ ਨੂੰ ਘਟਾਉਣ ਦੇ ਉਦੇਸ਼ਾਂ ਲਈ ਨਿਸ਼ਾਨਾਬੱਧ ਭੂਮੀਗਤ ਪ੍ਰੋਜੈਕਟਾਂ ਲਈ ਫੰਡਿੰਗ ਦੀ ਬੇਨਤੀ SCE ਦੇ ਜਨਰਲ ਰੇਟ ਕੇਸ ਕਾਰਵਾਈ ਦੇ ਹਿੱਸੇ ਵਜੋਂ ਕੀਤੀ ਜਾਂਦੀ ਹੈ ਅਤੇ ਇਹ ਨਿਯਮ 20 ਭੂਮੀਗਤ ਪ੍ਰੋਜੈਕਟਾਂ ਤੋਂ ਵੱਖਰਾ ਹੈ, ਜੋ ਕਿ ਇੱਕ ਸਰਕਾਰੀ ਏਜੰਸੀ (ਜਿਵੇਂ ਕਿ ਸ਼ਹਿਰ, ਕਾਉਂਟੀ), ਡਿਵੈਲਪਰ ਜਾਂ ਵਿਅਕਤੀਗਤ ਗਾਹਕ ਦੁਆਰਾ ਸ਼ੁਰੂ ਕੀਤੇ ਜਾਂਦੇ ਹਨ।
- Per current CPUC-approved tariff rules, customers are responsible for the cost of undergrounding service lines, which connect utility facilities to property owners’ electrical panels. These civil construction costs are typically paid to a private, licensed contractor hired by the homeowner to perform the civil work required to install an underground service line on the homeowner’s property. SCE is seeking alternative ways to help reduce this expense for these homeowners.
- At this point, there is an option for standing homes to remain with overhead service line connections with covered conductor.
ਵਰਤਮਾਨ ਵਿੱਚ, ਜੰਗਲੀ ਅੱਗ ਨੂੰ ਘਟਾਉਣ ਦੇ ਉਦੇਸ਼ਾਂ ਲਈ ਨਿਸ਼ਾਨਾਬੱਧ ਭੂਮੀਗਤ ਪ੍ਰੋਜੈਕਟਾਂ ਲਈ ਫੰਡਿੰਗ ਦੀ ਬੇਨਤੀ SCE ਦੇ ਜਨਰਲ ਰੇਟ ਕੇਸ ਕਾਰਵਾਈ ਦੇ ਹਿੱਸੇ ਵਜੋਂ ਕੀਤੀ ਜਾਂਦੀ ਹੈ ਅਤੇ ਇਹ ਨਿਯਮ 20 ਭੂਮੀਗਤ ਪ੍ਰੋਜੈਕਟਾਂ ਤੋਂ ਵੱਖਰਾ ਹੈ, ਜੋ ਕਿ ਇੱਕ ਸਰਕਾਰੀ ਏਜੰਸੀ (ਜਿਵੇਂ ਕਿ ਸ਼ਹਿਰ, ਕਾਉਂਟੀ), ਡਿਵੈਲਪਰ ਜਾਂ ਵਿਅਕਤੀਗਤ ਗਾਹਕ ਦੁਆਰਾ ਸ਼ੁਰੂ ਕੀਤੇ ਜਾਂਦੇ ਹਨ।
SCE ਟਾਰਗੇਟਡ ਅੰਡਰਗਰਾਊਂਡਿੰਗ ਵੈੱਬਸਾਈਟ ਕਾਉਂਟੀ ਦੁਆਰਾ ਨਕਸ਼ੇ ਪ੍ਰਦਾਨ ਕਰਦੀ ਹੈ। ਵੱਖ-ਵੱਖ ਭਾਈਚਾਰਿਆਂ ਵਿੱਚ ਅਸੀਂ ਜਿਸ ਕੰਮ ਦੀ ਯੋਜਨਾ ਬਣਾ ਰਹੇ ਹਾਂ, ਉਸ ਦੇ ਦਾਇਰੇ ਲਈ। ਭੂਮੀਗਤ ਕੰਮ ਦੇ ਵੱਖ-ਵੱਖ ਪੜਾਵਾਂ ਲਈ ਵੱਖ-ਵੱਖ ਪਰਮਿਟਾਂ ਦੀ ਲੋੜ ਹੋਵੇਗੀ। ਯੋਜਨਾਬੰਦੀ ਪੜਾਅ ਦੌਰਾਨ, SCE ਸ਼ਹਿਰ, ਕਾਉਂਟੀ ਅਤੇ ਕੈਲਟ੍ਰਾਂਸ ਨਾਲ ਛੇਤੀ ਪਰਮਿਟ ਅਰਜ਼ੀਆਂ ਸ਼ੁਰੂ ਕਰੇਗਾ। ਅਸੀਂ ਕਿਸੇ ਵੀ ਸਰਕਾਰੀ ਜ਼ਮੀਨ ਅਤੇ ਵਾਤਾਵਰਣ ਸੰਬੰਧੀ ਜ਼ਰੂਰਤਾਂ ਨੂੰ ਵੀ ਸ਼ੁਰੂ ਕਰਾਂਗੇ। ਜਿਵੇਂ ਹੀ ਅਸੀਂ ਸ਼ਡਿਊਲਿੰਗ ਪੜਾਅ ਵਿੱਚ ਜਾਂਦੇ ਹਾਂ, ਅਸੀਂ ਮਿਆਰੀ ਪਰਮਿਟਿੰਗ ਅਤੇ ਈਜ਼ਮੈਂਟ ਪ੍ਰਕਿਰਿਆਵਾਂ ਕਰਾਂਗੇ, ਵਾਤਾਵਰਣ ਕਲੀਅਰੈਂਸ ਪ੍ਰਕਿਰਿਆ ਕਰਾਂਗੇ ਅਤੇ ਲੋੜ ਪੈਣ 'ਤੇ ਵਾਧੂ ਏਜੰਸੀ ਪਰਮਿਟ ਪ੍ਰਾਪਤ ਕਰਾਂਗੇ। ਜ਼ਮੀਨਦੋਜ਼ ਉਸਾਰੀ ਲਈ ਪੂਰੇ ਰਸਤੇ 'ਤੇ ਰੁਕਾਵਟ ਦੀ ਲੋੜ ਹੁੰਦੀ ਹੈ, ਜਿਸ ਲਈ ਕਈ ਏਜੰਸੀਆਂ ਅਤੇ ਅਧਿਕਾਰ ਖੇਤਰਾਂ ਤੋਂ ਪ੍ਰਵਾਨਗੀ ਦੀ ਲੋੜ ਹੋ ਸਕਦੀ ਹੈ, ਨਾਲ ਹੀ ਵਧੇਰੇ ਵਿਆਪਕ ਸਮੀਖਿਆਵਾਂ ਅਤੇ ਪ੍ਰਵਾਨਗੀ ਦੀ ਵੀ ਲੋੜ ਹੋ ਸਕਦੀ ਹੈ।
No. An easement allows crews to access the property for construction or maintenance on SCE equipment and for that equipment to remain.
SCE will only enter the premises if equipment installation or maintenance is needed. Customers will be notified before crews arrive.
Once an agreement is reached, the easement is permanent and will stay with the property, even if the property ownership changes.
During the design phase, planners try to avoid the need for easements, but sometimes the only feasible path for underground equipment is through private property. If just one customer declines, the entire neighborhood may not be able to have underground lines.
SCE will only enter the premises if equipment installation or maintenance is needed. Customers will be notified before crews arrive.
No. An easement allows crews to access the property for construction or maintenance on SCE equipment and for that equipment to remain.
A Right of Entry (ROE) grants temporary permission to an entity, such as SCE, to enter and access a property for specific purposes (e.g., inspections, surveys or construction preparation).
An easement is a permanent property right that allows ongoing use of a portion of the property.
A Right of Entry (ROE) grants temporary permission to an entity, such as SCE, to enter and access a property for specific purposes (e.g., inspections, surveys or construction preparation). An easement is a permanent property right that allows ongoing use of a portion of the property.
ਬਿਜਲੀ ਦੀਆਂ ਤਾਰਾਂ ਨੂੰ ਭੂਮੀਗਤ ਕਰਨਾ ਇੱਕ ਬਹੁਤ ਹੀ ਗੁੰਝਲਦਾਰ ਪ੍ਰੋਜੈਕਟ ਹੈ, ਅਤੇ ਇਸ ਕਾਰਨ, ਕੰਮ ਦੀ ਪ੍ਰਗਤੀ ਦੇ ਨਾਲ-ਨਾਲ ਕੰਮ ਦੇ ਸਮੇਂ ਵਿੱਚ ਬਦਲਾਅ ਹੋ ਸਕਦਾ ਹੈ। ਆਮ ਤੌਰ 'ਤੇ ਕੰਮ ਸੋਮਵਾਰ ਤੋਂ ਸ਼ੁੱਕਰਵਾਰ ਸਵੇਰੇ 7 ਵਜੇ ਤੋਂ ਸ਼ਾਮ 7 ਵਜੇ ਤੱਕ ਹੋਵੇਗਾ ਅਤੇ ਕਦੇ-ਕਦਾਈਂ ਹਫਤੇ ਦੇ ਅੰਤ 'ਤੇ ਵੀ ਕੰਮ ਹੋ ਸਕਦਾ ਹੈ। ਬਿਜਲੀ ਦੀਆਂ ਤਾਰਾਂ ਨੂੰ ਭੂਮੀਗਤ ਕਰਨ ਦੇ ਕੰਮ ਲਈ ਸਮਾਂ ਉਹੀ ਰਹੇਗਾ, ਪਰ ਕੁਝ ਸਥਾਨਾਂ 'ਤੇ ਜ਼ਮੀਨ ਦੇ ਅੰਦਰ ਡਰਿਲਿੰਗ ਕਰਨ ਲਈ 24 ਘੰਟੇ ਕੰਮ ਕਰਨ ਦੀ ਲੋੜ ਹੋ ਸਕਦੀ ਹੈ।
SCE ਵਾਹਨਾਂ 'ਤੇ ਕੰਪਨੀ ਦਾ ਲੋਗੋ ਹੋਵੇਗਾ। ਇਸ ਕੰਮ ਨਾਲ ਜੁੜੇ ਕਿਸੇ ਵੀ ਵਿਅਕਤੀ ਕੋਲ ਪਛਾਣ ਪੱਤਰ ਵੀ ਹੋਣਗੇ।
ਨਿਸ਼ਾਨਾਬੱਧ ਭੂਮੀਗਤ ਕੰਮ ਲਈ ਕਦੇ-ਕਦਾਈਂ ਵਿਅਕਤੀਗਤ ਜਾਇਦਾਦ ਤੱਕ ਪਹੁੰਚ ਦੀ ਲੋੜ ਹੋ ਸਕਦੀ ਹੈ, ਪਰ ਜਾਇਦਾਦ ਮਾਲਕਾਂ ਨੂੰ ਸਮੇਂ ਤੋਂ ਪਹਿਲਾਂ ਸੂਚਿਤ ਕੀਤਾ ਜਾਵੇਗਾ। ਅਸੀਂ ਸਮਝਦੇ ਹਾਂ ਕਿ ਟ੍ਰੈਫਿਕ ਸਾਡੇ ਸਾਰਿਆਂ ਦੇ ਜੀਵਨ 'ਤੇ ਕਿੰਨਾ ਦਬਾਅ ਪਾ ਸਕਦਾ ਹੈ ਅਤੇ SCE ਟ੍ਰੈਫਿਕ ਪ੍ਰਭਾਵਾਂ ਦੇ ਆਲੇ-ਦੁਆਲੇ ਜਨਤਕ ਪਹੁੰਚ 'ਤੇ ਸ਼ਹਿਰ ਦੇ ਨਾਲ ਬਹੁਤ ਨੇੜਿਓਂ ਕੰਮ ਕਰੇਗਾ ਤਾਂ ਜੋ ਅਸੀਂ ਇਹ ਯਕੀਨੀ ਬਣਾ ਸਕੀਏ ਕਿ ਲੋਕ ਬੰਦ ਹੋਣ ਦੇ ਆਲੇ-ਦੁਆਲੇ ਆਪਣੇ ਆਉਣ-ਜਾਣ ਅਤੇ ਰੋਜ਼ਾਨਾ ਦੇ ਕੰਮਾਂ ਦੀ ਯੋਜਨਾ ਬਣਾਉਣ। ਅਸੀਂ ਲੇਨ ਬੰਦ ਹੋਣ ਦੇ ਪ੍ਰਭਾਵ ਨੂੰ ਖਤਮ ਨਹੀਂ ਕਰ ਸਕਦੇ, ਪਰ ਅਸੀਂ ਇਸ ਬਾਰੇ ਗੱਲ ਫੈਲਾ ਕੇ ਅਸੁਵਿਧਾਵਾਂ ਨੂੰ ਘੱਟ ਕਰ ਸਕਦੇ ਹਾਂ।
ਭਾਵੇਂ ਜ਼ਮੀਨਦੋਜ਼ ਉਸਾਰੀ ਦੇ ਕੰਮ ਦੌਰਾਨ ਧੂੜ ਨੂੰ ਪੂਰੀ ਤਰ੍ਹਾਂ ਖਤਮ ਨਹੀਂ ਕੀਤਾ ਜਾ ਸਕਦਾ, ਪਰ ਤੁਸੀਂ ਉਸਾਰੀ ਦੇ ਉਪਕਰਣਾਂ ਅਤੇ ਵਾਹਨਾਂ ਦੇ ਸੰਚਾਲਨ ਦੌਰਾਨ ਕੰਮ ਵਾਲੀ ਥਾਂ 'ਤੇ ਸਮੇਂ-ਸਮੇਂ 'ਤੇ ਪਾਣੀ ਦਾ ਛਿੜਕਾਅ ਕਰਦੇ ਹੋਏ ਇੱਕ ਪਾਣੀ ਵਾਲਾ ਟਰੱਕ ਵੀ ਦੇਖ ਸਕਦੇ ਹੋ ਤਾਂ ਜੋ ਭੱਜਣ ਵਾਲੀ ਧੂੜ ਨੂੰ ਘਟਾਉਣ ਵਿੱਚ ਮਦਦ ਮਿਲ ਸਕੇ। ਇਹ ਪ੍ਰੋਜੈਕਟ ਦੇ ਧੂੜ ਕੰਟਰੋਲ ਦਿਸ਼ਾ-ਨਿਰਦੇਸ਼ਾਂ ਦੇ ਅਨੁਸਾਰ ਕੀਤਾ ਜਾ ਰਿਹਾ ਹੈ। ਇੱਥੇ ਕੁਝ ਸਧਾਰਨ ਸੁਝਾਅ ਹਨ ਜੋ ਤੁਹਾਨੂੰ ਉਸਾਰੀ ਵਿੱਚ ਵਿਘਨ ਘਟਾਉਣ ਵਿੱਚ ਮਦਦ ਕਰ ਸਕਦੇ ਹਨ: ਸ਼ੋਰ ਅਤੇ ਧੂੜ ਨੂੰ ਘਟਾਉਣ ਲਈ ਉਸਾਰੀ ਖੇਤਰ ਵੱਲ ਮੂੰਹ ਵਾਲੀਆਂ ਖਿੜਕੀਆਂ ਅਤੇ ਦਰਵਾਜ਼ੇ ਬੰਦ ਕਰੋ, ਅਤੇ ਇਹ ਯਕੀਨੀ ਬਣਾਉਣ ਲਈ ਪ੍ਰੋਜੈਕਟ ਅਪਡੇਟਸ 'ਤੇ ਨਜ਼ਰ ਰੱਖੋ ਕਿ ਤੁਹਾਡੇ ਕੋਲ ਤੁਹਾਡੇ ਖੇਤਰ ਵਿੱਚ ਹੋ ਰਹੇ ਕੰਮ ਬਾਰੇ ਸਭ ਤੋਂ ਤਾਜ਼ਾ ਜਾਣਕਾਰੀ ਹੈ।
ਇੱਕ ਵਾਰ ਜ਼ਮੀਨਦੋਜ਼ ਉਸਾਰੀ ਦਾ ਕੰਮ ਪੂਰਾ ਹੋ ਜਾਣ ਤੋਂ ਬਾਅਦ, SCE ਪ੍ਰੋਜੈਕਟ ਦੇ ਕੰਮ ਵਾਲੇ ਖੇਤਰਾਂ ਵਿੱਚ ਉਸਾਰੀ ਤੋਂ ਬਾਅਦ ਦੀ ਸਫਾਈ ਅਤੇ ਬਹਾਲੀ ਦੀਆਂ ਗਤੀਵਿਧੀਆਂ ਕਰੇਗਾ।
ਗਾਹਕਾਂ ਨੂੰ ਬਿਜਲੀ ਦਾ ਬਿਜਲੀ ਦਾ ਅਨੁਭਵ ਹੋ ਸਕਦਾ ਹੈ ਜੋ ਨਿਸ਼ਾਨਾ ਬਣਾਏ ਗਏ ਭੂਮੀਗਤ ਕੰਮ ਨਾਲ ਸਬੰਧਿਤ ਹੈ ਅਤੇ ਅਸੀਂ ਜਾਣਦੇ ਹਾਂ ਕਿ ਅਸਥਾਈ ਬਿਜਲੀ ਦਾ ਬਿਜਲੀ ਅਸੁਵਿਧਾਜਨਕ ਹੋ ਸਕਦੀ ਹੈ ਅਤੇ ਤੁਹਾਡੇ ਧੀਰਜ ਦੀ ਸ਼ਲਾਘਾ ਕਰਦੇ ਹਾਂ। ਇਹਨਾਂ ਮਾਮਲਿਆਂ ਵਿੱਚ, ਅਸੀਂ ਤੁਹਾਨੂੰ ਬਿਜਲੀ ਕੱਟਣ ਤੋਂ ਘੱਟੋ-ਘੱਟ 72 ਘੰਟੇ ਪਹਿਲਾਂ ਫ਼ੋਨ, ਟੈਕਸਟ, ਈਮੇਲ ਜਾਂ ਡਾਕ ਰਾਹੀਂ ਸੂਚਿਤ ਕਰਾਂਗੇ ਤਾਂ ਜੋ ਤੁਸੀਂ ਕੋਈ ਵੀ ਜ਼ਰੂਰੀ ਸਾਵਧਾਨੀ ਵਰਤ ਸਕੋ। ਹਾਲਾਂਕਿ, ਕਿਰਪਾ ਕਰਕੇ ਧਿਆਨ ਰੱਖੋ ਕਿ ਸੁਰੱਖਿਆ ਕਾਰਨਾਂ ਕਰਕੇ ਸਮਾਂ ਬਦਲ ਸਕਦਾ ਹੈ। ਇਹ ਸੰਭਵ ਹੈ ਕਿ ਬਿਜਲੀ ਦਾ ਬਿਜਲੀ ਦਾ ਸਮਾਂ ਯੋਜਨਾਬੱਧ ਤੋਂ ਪਹਿਲਾਂ ਮੁੜ ਤਹਿ ਕੀਤਾ ਜਾ ਸਕਦਾ ਹੈ, ਰੱਦ ਕੀਤਾ ਜਾ ਸਕਦਾ ਹੈ ਜਾਂ ਸਮਾਪਤ ਕੀਤਾ ਜਾ ਸਕਦਾ ਹੈ। ਤੁਹਾਡੀ ਸੂਚਨਾ ਵਿੱਚ ਇੱਕ ਅਨੁਸੂਚਿਤ ਬਿਜਲੀ ਦਾ ਬਿਜਲੀ ਨੰਬਰ ਸ਼ਾਮਲ ਹੋਵੇਗਾ ਜੋ ਤੁਸੀਂ ਨਵੀਨਤਮ ਅੱਪਡੇਟ ਪ੍ਰਾਪਤ ਕਰਨ ਲਈ ਸਾਡੇ ਬਿਜਲੀ ਦੇ ਨਕਸ਼ੇ ਵਿੱਚ ਦਾਖਲ ਕਰ ਸਕਦੇ ਹੋ।
ਜੇਕਰ ਤੁਹਾਨੂੰ ਲੱਗਦਾ ਹੈ ਕਿ SCE ਤੁਹਾਡੀ ਜਾਇਦਾਦ ਨੂੰ ਹੋਏ ਨੁਕਸਾਨ ਲਈ ਜ਼ਿੰਮੇਵਾਰ ਹੈ, ਤਾਂ ਤੁਸੀਂ ਦਾਅਵਾ ਦਾਇਰ ਕਰ ਸਕਦੇ ਹੋ। SCE ਦਾਅਵੇ ਵਿਭਾਗ ਕੇਸ-ਦਰ-ਕੇਸ ਦੇ ਆਧਾਰ 'ਤੇ ਦਾਅਵਿਆਂ ਦਾ ਮੁਲਾਂਕਣ ਕਰੇਗਾ। ਤੁਸੀਂ sce.com/claims ' ਤੇ ਜਾ ਕੇ ਦਾਅਵਾ ਦਾਇਰ ਕਰਨ ਬਾਰੇ ਹੋਰ ਜਾਣਕਾਰੀ ਪ੍ਰਾਪਤ ਕਰ ਸਕਦੇ ਹੋ।
ਜੇਕਰ ਤੁਹਾਡੇ ਕੋਲ ਵੈੱਬਸਾਈਟ 'ਤੇ ਕੁਝ ਖਾਸ ਸਵਾਲਾਂ ਦੇ ਜਵਾਬ ਨਹੀਂ ਹਨ, ਤਾਂ ਤੁਸੀਂ ਪ੍ਰੋਜੈਕਟ ਟੀਮ ਲਈ ਇਸਦੇ ਸਮਰਪਿਤ ਫ਼ੋਨ ਵੌਇਸਮੇਲ ਬਾਕਸ 'ਤੇ 1-888-331-0010 'ਤੇ ਇੱਕ ਵੌਇਸਮੇਲ ਛੱਡ ਸਕਦੇ ਹੋ।
Additional Information
Contact Us
Please email us or leave a voice message for the Targeted Undergrounding project team on our dedicated phone voicemail.
Email: SCEprojects@sce.com
Phone: 1-888-331-0010
1 An assessment is only to determine the feasibility of undergrounding power lines in the areas identified. It is not guaranteed that SCE will perform this work in your community.
2 Work may be rescheduled or delayed for various reasons, including crews' need to focus on emergency repairs, outage restrictions during heat storms and the discovery of endangered species or historical artifacts on-site.