Locations with completed covered conductor projects. SCE is strengthening its system by replacing bare wire with covered conductor, which are power lines with durable protective coating to help prevent sparks when objects such as flying tree branch during strong winds or an animal comes in contact with the line. To learn more, visit Wildfire Mitigation Efforts.
Locations with planned covered conductor projects. SCE is strengthening its system by replacing bare wire with covered conductor, which are power lines with durable protective coating to help prevent sparks when objects such as flying tree branch during strong winds or an animal comes in contact with the line. To learn more, visit Wildfire Mitigation Efforts.
Locations with completed undergrounding projects. SCE is undergrounding power lines, targeting the highest fire risk areas especially where lines have not been replaced by covered conductor. This map only shows undergrounding projects related to wildfire mitigation. To learn more, visit Wildfire Mitigation Efforts.
Locations with planned undergrounding projects. SCE is undergrounding power lines, targeting the highest fire risk areas especially where lines have not been replaced by covered conductor. This map only shows undergrounding projects related to wildfire mitigation. To learn more, visit Wildfire Mitigation Efforts.
Locations of high-definition wildfire cameras that pan, tilt, zoom and perform 360-degree sweeps approximately every minute to help monitor wildfire conditions in high fire risk areas. Each location typically has two cameras installed. To view the live camera feeds, visit ALERTCalifornia.
Locations of weather stations that provide wind speed, humidity and temperature data that is updated every few minutes. The data allows more targeted de-energizations during Public Safety Power Shutoffs. To view current weather conditions, red flag warnings and other wildfire-related threats, visit: Weather and Fire Detection.
Areas with high risk of wildfires.
Areas that are served by a circuit that crosses a high fire risk area and may experience Public Safety Power Shutoffs.
Areas where Southern California Edison provides electric service to customers.
Fire perimeters of Eaton and Palisades fires
アプリケーションを読み込み中です。しばらくお待ちください。
注記:本マップに表示されている内容は、説明目的のみに使用されています。マップ上の情報は、SCEが提出する公式な規制報告書や提出資料に代わるものではありません。この縮尺では、距離や位置が正確に表示されない場合があります。計画中の作業は、規制当局の承認、技術的な実現可能性、許認可、その他の要因により変更される場合があります。プロジェクトが当初予定していた年内に完了しない場合、翌年以降に継続されることがあります。本マップは毎月更新されます。
SCEの山火事緩和計画は、送電網のレジリエンスを高め、山火事リスクを低減するための明確な道筋を示しています。戦略的かつ包括的なアプローチのもと、SCEは、送電網の強化、設備点検、植生管理を優先的に実施し、山火事を未然に防ぐとともに、サービスを提供する地域社会の安全確保に取り組んでいます。地区ごとに山火事対策の進捗を把握し、そのデータを基に、合理的な推計として郡レベルでの状況を算出しています。
Frequently Asked Questions
FAQ
1. Design
During the design phase, SCE determines the best options for hardening based on circuit outage history, location of the circuit, and surrounding area including vegetation near the equipment and past weather conditions. This analysis is an important step to determine the type of work that can be completed at the proposed area and the specific details needed to define the scope of work.
2. Permitting
Once the scope of work is established, SCE can determine if permitting is required. Most projects require at least one permit for road closures, typically from a city, county, or Caltrans. Additional permit requirements depend on the project’s location. They may include state and federal land permits, environmental clearances, private property easements, Federal Aviation Administration approvals or railroad rights-of-way permits. Permit approval may take as short as two months, or the process may be significantly longer.
3. Construction
Work can be scheduled and construction can begin once all the required permits are received. In most cases, this work will require a power outage at the end of construction when the power is ready to be switched from the bare overhead line to covered conductor or undergrounded lines. We will notify customers in advance if an outage is needed.
Safety is SCE’s number one priority. SCE’s grid hardening work keeps safety top of mind and uses a comprehensive strategy that builds on continuous efforts to address immediate and long-term wildfire risks in response to changing community needs and extreme weather events. We continue to harden the grid and invest in resiliency measures including installing covered conductor, undergrounding power lines, clearing vegetation near power lines, inspecting equipment for repairs and maintenance and integrating advanced technologies to reduce the risk of wildfires by utility equipment.
SCE develops and deploys grid hardening in the areas of greatest risk. We continue to prioritize our riskiest areas first. To determine High Fire Risk Areas, SCE uses a combination of wildfire risk modeling, CPUC's High Fire Threat District map and historical fire data. As the threat of wildfire continues to grow, SCE regularly checks its service area to assess the risk factors.
By replacing bare power lines with covered conductor and undergrounding lines in high fire risk areas, SCE significantly reduces the chance of ignitions during extreme weather events. It helps prevent outages and ensures a more reliable power supply. Enhanced infrastructure and predictive analytics improvements help to reduce the impact of PSPS events. Fast-acting fuses and automated switches improve the precision of shutoffs, minimizing the number of affected customers and enhancing overall safety. Strengthening the electrical grid supports the integration of more clean energy resources, contributing to California's goal of reducing greenhouse gas emissions .