Skip to main content
Southern California Edison Southern California Edison
  • Mga Outage at Safety
  • Mga Outage at Safety
    • I-report ang Outage o mga Isyu sa Safety
      • Iulat ang Outage
    • Outage Center
      • I-check ang Status ng Pag-brownout
      • Kumuha ng Mga Alerto
      • Garantiya ng Aming Serbisyo
    • Paghahanda sa Outage
      • Mga Tip sa Outage
      • Programa ng Baterya sa Pag-backup ng Kritikal na Pangangalaga
      • Mga Backup Power Solution
      • Battery Energy Storage System (BESS)
      • Mga Uri ng Brownout
    • Manatiling Ligtas
      • Mga Tip sa Outdoor
      • Kaligtasan ng Iyong Pamilya
      • Manatiling Ligtas Laban sa Mga Scam
    • Mga Mapagkukunan ng Impormasyon at Suporta para sa Kaligtasan
      • Suporta sa Panahon ng Mga Emergency
      • Access & Functional Needs
      • Sentro ng Mapagkukunan ng Tulong sa Komunidad
      • Mga Lokasyon ng Cooling Center
      • Pagsasanay at Edukasyon
    • Kaligtasan Kapag May Wildfire
      • Pagbawas sa Wildfire
      • Pag-detect ng Weather at Sunog
      • Mga Planadong Outage na May Kaugnayan sa Kaligtasan
      • Wildfire Communications Center
      • Mga Kritikal na Pasilidad at Kritikal na Imprastraktura
      • Pagpapatibay ng Grid
  • Magtipid ng Pera
  • Magtipid ng Pera
    • Mga Income Qualified Program
      • CARE & FERA
      • Energy Savings Assistance Program
      • Arrearage Management Plan
    • Mga Rebate at Tulong Pinansyal
      • Bill Assistance Programs
      • Mga Rebate at SCE Marketplace
    • Savings Programs
      • Ways to Save at Home
      • Enroll in Savings Programs
      • Keeping Bills Manageable
    • Rates & Financing
      • Mga Residential Rate Plan at Mga Detalye
      • Tool sa Paghahambing ng Rate Plan
      • Mga Electric Vehicle Plan
      • Mga Multifamily Rate at Billing
      • Advisory sa Rate ng SCE
  • Clean Energy at Efficiency
  • Clean Energy at Efficiency
    • Efficiency sa Bahay
      • Energy Efficiency sa Bahay
      • Energy Efficiency Financing
      • Sentro ng Pamamahala sa Enerhiya (Energy Management Center)
      • Gabay sa Kahusayan ng Tahanan
      • Clean Energy at Ikaw
      • Community Renewables Program
    • Mga Electric na Sasakyan
      • Pagsisimula
      • Mga Rebate at Rate sa EV
      • Pag-charge ng Iyong EV
      • EV para sa Negosyo
    • Solar - Pag-generate ng Iyong Sariling Power
      • Mga Pangunahing Kaalaman sa Solar Power
      • Programang Panghimok ng Paglikha ng Sariling Kuryente
      • Billing at Mga Insentibo
    • Energy Education
      • Mga Kategorya at Paglalarawan ng Klase
      • Mga Education at Experience Center
      • Foodservice Technology Center
      • Technology Test Center
    • Pag-develop ng Workforce
      • Mga Insight sa Career
      • Mga Programa sa Edukasyon
      • Pinansyal na Suporta
      • Mga Resource sa Trabaho
      • Pananaliksik at Mga Resource
      • Pagsasanay
  • Para sa Negosyo
  • Para sa Negosyo
    • Smart Energy at Solar
      • Solar para sa Negosyo
      • Mga EV para sa Negosyo
      • Mga Energy Efficiency Program
    • Makatipid sa Mga Gastos at Enerhiya
      • Mga Estratehiya sa Pagtitipid para sa mga Negosyo
      • Mag-enroll sa Mga Cost Savings Program
      • Tulong sa Pagpapaunlad ng Ekonomiya
      • Pagtitipid Ayon sa Uri ng Negosyo
    • Mga Rate at Financing
      • Mga Business Rate Plan
      • Mga Rate ayon sa Laki ng Negosyo
      • Mga Opsyon sa Financing sa Energy Efficiency
    • Mga Resource ng Komunidad ng Negosyo
      • Mga Resource ng Negosyo
      • Mga Serbisyo sa Pagkonsulta sa Negosyo
      • Mga Sentro ng Edukasyon sa Kuryente
      • Pag-develop ng Workforce
search icon
Search Powered by Bing Microsoft Privacy Statement
avatar-icon avatar-icon
My Account
Login / Register with SCE.com to pay your bills, check your usage, and much more!

New to SCE.com?

Register
Hi, John
My Dashboard
Log Out
  • My Account
    • My Account
      • Bills & Usage
      • Mga Pagbabayad
      • Account Settings
    • Rate Plans
      • Time-Of-Use Plans
      • Tiered Rate Plan
    • Construction & Renovation
      • Submit a New Request
      • Project Portal
      • SCE Project Center
    • Bill Assistance & Savings
      • One-time Bill Assistance
      • Income-Qualified Programs
      • Households Dependent on Medical Equipment
    • Customer Service Center
      • Billing & Payments
      • Move Center
      • Community Choice Aggregation
      • Help Center
      • Claims, Forms & Requests
Grid Interconnections
  • Clean Energy & Efficiency
  • / Solar - Generating Your Own Power
  • / Solar Power Basics
this element added for skip to main content issue fixes

Requirements and Processes for Interconnection Projects

  • Please review our Queue Cluster (QC) 16 presentation: QC16 Presentation.
  • Please use this link to access the Grid Interconnection Processing Tool.
    • We are currently accepting new Wholesale Distribution Access Tariff (WDAT) Interconnection Requests and Rule 21 Non-Export requests in the tool. Please see the Rule 21 page for more information regarding submittal of Rule 21 Export requests.

For more information, please see the following section of our website: Grid Interconnection Processing Tool (GIPT) Information.

The information on this page is intended to help our customers understand the requirements and processes for interconnecting projects to SCE’s electric system.

You can navigate through the sections below or you can get started by reviewing our introduction to SCE’s Generator Interconnection Processes.

 

Announcements
 

  • Distribution Group Study (DGS) Application Window #22, Opening Date: Saturday, August 15, 2026. Closing Date: Tuesday, September 15, 2026. For more information, view SCE’s Rule 21 page.
  • On October 30, 2025, from 10-11am Pacific Time via Teams only, pursuant to a requirement in the WDAT storage settlement, SCE will hold a call to provide an update on the status of the implementation of SCE’s distributed energy resource management system (“DERMS”) as it pertains to energy storage. 

    The relevant requirement in the settlement is the following:

    Reporting Obligations Related to Firm Window Service

    4.13. SCE is committed to exploring whether it can offer a service whereby a storage Resource can have a combination of Firm Charging Distribution Service and As-Available Charging Distribution Service that changes on an hourly basis (“Firm Window Service”). For the extent of the Moratorium, SCE will host a call once a year in the month of October to provide an update on the status of the implementation of SCE’s distributed energy resource management system (“DERMS”) as it pertains to energy storage. SCE will provide thirty days’ notice of this call to the Parties, shall post a notice on its website, and shall serve a notice on all then-current WDAT customers, including those in the queue, pursuant to the requirements for service under 18 C.F.R. § 35.2(e).

    Microsoft Teams Need help? 
    Join the meeting now 
    Meeting ID: 257 590 834 305 1 
    Passcode: XQ6q28d7 
    Dial in by phone 
    +1 213-297-0156,,172038460# United States, Los Angeles
    Find a local number
    Phone conference ID: 172 038 460#

     

  • On March 13, 2026 SCE shared the following 2026 Unit Cost Guide Pre-Posting Presentation:
    SCE 2026 Unit Cost Guide Pre-Posting Presentation_Final.pdf
  • WDAT Queue Cluster Window #16 (QC16) is anticipated to open on Friday, September 11, 2026, and to close on Friday, September 25, 2026. SCE may modify the dates based on CAISO’s Cluster study schedule.
  • On August 14, 2024, SCE submitted its Order No. 2023 compliance filing with FERC in Docket No. ER24-2776. SCE requested an effective date of August 15, 2024. Accordingly, as of August 15, 2024, no WDAT Independent Study Process (ISP) Interconnection Requests will be accepted.
  • As of Monday, July 19, 2021, the new Rule 21 Non-Export Notification Only Process for pre-approved developers became available. Additional information about eligibility, becoming a pre-approved developer, and submitting notifications can be found by navigating to the Rule 21 section of this site. Once in the Rule 21 section, expand the “Rule 21 Non-Export Notification Only Process” menu item.
  • SCE is developing a plan to implement CAISO’s proposed immediate adjustments to Cluster 15 study schedule. Additional information will be provided when it becomes available. Please see Issue-Paper-and-Straw-Proposal-Interconnecton-Process-Enhancements-2023-Mar132023.pdf (caiso.com)
  • Please see the Wholesale Distribution Access Tariff section of this website for information regarding tariff updates effective October 30, 2019
  • CAISO’s Distributed Generation Deliverability (DGD) Process. Information and prior years’ DGD allocation results are available on our page regarding Interconnections to the CAISO. Navigate and expand the following header for additional information: CAISO’s Distributed Generation Deliverability Assignment Application Window.

 

Contact Us

Should you have any questions regarding our interconnection processes, please reach out to either the Grid Interconnection and Contract Development (GICD) team or the Net Energy Metering (NEM) / Solar Billing Plan (SBP) team: 

Grid Interconnection & Contract Development – Rule 21 Non-Export, Rule 21 Export, Wholesale Distribution Access Tariff (WDAT) and Transmission Owner Tariff (TOT)

Email: interconnectionQA@sce.com
Phone: (909) 274-1106
Mailing Address:
Grid Interconnection & Contract Development
Southern California Edison
2244 Walnut Grove Ave
Rosemead, CA 91770


Email Distribution List:
To subscribe to the GICD mailing list for notices about interconnection events, please email us.

Solar Billing Plan & Net Energy Metering – Customers who produce their own electricity through an eligible renewable distributed generation system on the Solar Billing Plan or Net Energy Metering (NEM) rate options. These rate options allow our customers to receive energy credits for the surplus electricity supplied to the electric grid.

Email: Customer.Generation@sce.com
Phone: (866) 600-6290
Mailing Address:
Southern California Edison
2244 Walnut Grove Ave
Rosemead, CA 91770


Email Distribution List:
To subscribe to the Customer Generation email list to receive notices about interconnection events and updates, please email us.

Rule 21 Ombudsman Information
To address disputes regarding Rule 21 missed timelines, please contact SCE's appointed ombudsman:

Rod Vickers, Project Manager
Email: Rule21.Ombudsman@sce.com
Phone: (714) 895-0211

 

DISCLAIMER: The guidelines in this section are provided with the intent to help SCE’s customers understand SCE’s Interconnection Procedures. However, in the case of discrepancies with SCE’s rules, such tariffs and regulations will prevail.

Quick Links & Resources

 

  • Generating Power for Sales
  • Programs for Self-Generation at Home or Business
  • Backup Systems
  • Qualifying Facility Conversions

 

Generation Project Types

Rules & Regulations

  • Rule 21
  • Wholesale Distribution Access Tariff (WDAT)
  • Transmission Owner Tariff
  • Interconnections to California Independent System Operator (CAISO)

 

Resources

  • CAD File Requirements
  • Distribution Resources Plan External Portal (DRPEP)
  • Electrical Service Requirements (ESR)
  • Interconnection Handbook
  • Interconnection Queue
  • Redacted Interconnection Study Reports
  • Request Base Case Data
  • Rule 21 Unit Cost Guide
  • Grid Interconnection Processing Tool (GIPT) Information

Many of your questions may have been answered in one of the following FAQs:

  • WDAT Processes
  • Rule 21
  • Net-Energy Metering
  • Renewable Energy Self-Generation Bill Credit Transfer Program (RES-BCT)
  • Grid Interconnection Processing Tool FAQ
Language:
  • English
  • ESPAÑOL
  • 한국어
  • 中文
  • TIẾNG VIỆT
  • Tagalog
  • عربى
  • հայերեն
  • فارسی
  • Français
  • Deutsch
  • 日本語
  • ខ្មែរ
  • ਪੰਜਾਬੀ
  • русский
  • Português
  • हिंदी
  • Hmong
  • Thai

Tungkol sa SCE

  • Corporate Governance
  • Pagbibigay ng Komunidad
  • Kapaligiran
  • Maaasahan
  • Pagkuha ng Enerhiya
  • Impormasyon sa Regulasyon
  • Open Noticed CPUC Proceedings
  • Accessibility

Partners

  • Mga Tagabigay ng Enerhiya ng 3rd Party
  • Mga Developer at Tagabuo
  • Mga Resource
  • Mga Serbisyo sa Pagkonsulta
  • Installation Management Services (Telecom)
  • Power Capacity and Availability

Customer Service Center

  • Pagsingil at Mga Pagbabayad
  • Move Center
  • Help Center
  • Construction & Renovation
  • Submit Claims, Forms & Requests
  • Pagtitipid ng Enerhiya
  • Katipunan ng Pagpili ng Komunidad
  • Catalina Island Utility Services
  • Edison International
  • ENERGIZED by Edison
  • Silid-balitaan
  • Mga karera
  • Facebook
  • Instagram
  • X
  • LinkedIn
  • YouTube
Southern California Edison
header line
Energy for What's Ahead ®
Mga Tuntunin at Kundisyon
Paunawa sa Privacy
Kahilingan ng Personal na Impormasyon
Do Not Sell My Personal Information
Copyright Act
Sitemap

©  copyright Southern California Edison

This website and the messages contained in its webpages are funded by ratepayers unless otherwise noted.