Effective October 1, 2021 the rate components listed below changed as follows.
- Distribution – for all rates
- PPPC – for all rates
- NSGC – for all rates
- CIA – for all applicable Residential rates
- SCE Gen – (including the RTP hourly factors) for all rates
- PCIA – (all vintages except 2001 and 2004) for all rates
- CARE Surcharge – for all rates
- FERA Discount % – for all TOU FERA rates
- Dual Participation CAP – for all applicable rates
- Wildfire FRC – For changes related to SCE’s Wildfire Fixed Recovery Charge, please visit www.sce.com/understandyourbill for more information
California Alternate Rates for Energy (CARE)
SCE’s current and revised CARE Surcharge and CARE Discount Percentage are listed below:
Rate Component | $/kWh Rate or Percentage Prior to October 1, 2021 | $/kWh Rate or Percentage as of October 1, 2021 |
---|---|---|
CARE Surcharge* | 0.00907 | 0.01008 |
CARE Discount for Commercial Accounts | 28.3% | 28.4% |
*The CARE Surcharge rate is shown in dollars/kWh. All non-CARE, non-Street Lighting customers pay this same amount on an equal dollars/kWh basis.
2021 Rate Changes
SCE Tariff Books
Related Links
- FERC Standards of Conduct
- Regulatory Information - Santa Catalina Gas Water Tariffs
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification