June 2013 Rate Changes
Effective June 1, 2013, the following Southern California Edison (SCE) rate factors increased:
- The Distribution Charge will decrease for all rates; except for PA-2, GS-2, TOU-8 (above 50kV), TOU-Standby (Option B and RTP), TOU-GS-1 and 2 (Option B and RTP), which will increase.
- The Distribution charge for the Customer Charge - $/Daily will increase for TC-1.
- The Total Delivery Charge will increase for various Domestic Medical Baseline and TOU rate options.
Effective June 1, 2013, the following SCE rate factors decreased:
- The Distribution charge for the Customer Charge - $/month, will decrease for PA-1 and PA-2.
- The Monthly Charge for TOU-GS-1 (Option B) will decrease.
- The Public Purpose Programs Charge (PPPC) will decrease for the TOU-PA-2, TOU-PA-2 (Option SOP-2), TOU-PA-3 (Option A), TOU-PA-3 (Option B), TOU-PA-3 (Option SOP-1), TOU-PA-3 (Option SOP-2).
- The Utility Regulated Generation (URG) will decrease, based on tiered structure, for all domestic rates, TOU-GS-1 (Option B), TOU-GS-2 (Option A and B), TOU-GS-3 (Option A and B), TOU-8- Standby (Option A and B Above 50kV).
- The SCE Generation Charge will decrease for EV-1, PA-TOU 8-Option A (Above 50kV).
- The Total Delivery Charge (Voltage Discount and Facilities Related Charge) will decrease for GS-1 (Option B and RTP), GS-2 (Option A, B, and R), TOU-GS-1, TOU-EV-1, TOU-GS-3 (Option A, B and R), TOU-8-RTP.
- TOU-D-1 and TOU-D-2 rate schedules were replaced with TOU-D-T
Effective June 1, 2013, the following SCE rate factors changed (increased or decreased, based on tiered rate structure):
- The Utility Regulated Generation (URG) will decrease, based on tiered structure, for all domestic rates, TOU-GS-1 (Option B), TOU-GS-2 (Option A and B), TOU-GS-3 (Option A and B), TOU-8- Standby (Option A and B Above 50kV).
- The Conservation Incentive Adjustment (CIA) decreased for all domestic tiered rates, TOU-DT, and TOU- TEV.
- The Transmission Owner Tariff Change Adjustment (TOTCA) increased for all rates based on tier structures.
The actual impact of these rate factor changes on customers’ bills will vary based on energy usage.
California Alternate Rates for Energy (CARE)
SCE’s current and revised CARE Surcharge and CARE Discount Percentage are listed below: California Alternate Rates for Energy (CARE)
Rate Component | Rate or Percentage Prior to October 1, 2012 | Rate or Percentage as of October 1, 2012 |
---|---|---|
CARE Surcharge* | 0.00516 | 0.00517 |
CARE Discount for Commercial Accounts | 25.8% | 25.8% |
*The CARE Surcharge rate is shown in dollars/kWh. All non-CARE, non-Street Lighting customers pay this same amount on an equal dollars/kWh basis.
2013 Rate Changes
SCE Tariff Books
Related Links
- FERC Standards of Conduct
- Regulatory Information - Santa Catalina Gas Water Tariffs
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification