Orange Regional Transmission Project
New transmission lines are needed to meet California’s growing demand for electricity. Adding transmission capacity will support a reliable, resilient electric system that is ready to deliver clean energy when and where it’s needed.
The Orange Regional Transmission Project will strengthen Southern California’s grid and help deliver energy from renewable generation sources.
The majority of the line is proposed for construction within an existing electrical transmission corridor, which minimizes the need for new corridors and reduces potential impacts on the environment and communities. Structures would be similar to those used for existing high-voltage transmission lines. Final design, route and alternatives will be evaluated through the regulatory process.
This project is part of a statewide grid planning effort led by the California Independent System Operator, the agency responsible for planning the state’s transmission needs and managing the electrical grid.
The Orange Regional Transmission Project, previously known as the North of SONGS-Serrano Transmission Project, is part of a portfolio of projects identified by the California Independent System Operator in their 2022-2023 Transmission Planning Process as necessary to meet the future needs of the region’s electric grid.
The project includes:
• Construction of a ~33 mile, 500-kilovolt transmission line
• Removal or replacement of some existing transmission structures
• Modifications to SCE’s existing Serrano Substation
The project connects:
• Serrano Substation in Orange County
• Horizon West’s proposed Recon Substation north of Camp Pendleton
Communities along the route include Orange, Lake Forest, Mission Viejo, Rancho Santa Margarita, Las Flores, Silverado, Coto de Caza, Trabuco Canyon and Ladera Ranch, as well as other unincorporated areas of Orange County.
Growing electrical demands of homes and businesses in the region will soon exceed what existing grid infrastructure can reliably provide, according to the California Independent System Operator. The Orange Regional Transmission Project will meet the increasing electric transmission capacity needs of the Los Angeles Basin, including Orange County and northern San Diego County.
This project is designed to:
- Enhance grid reliability: The project will strengthen the electric grid in the region, making it more reliable and resilient. This is especially important as electricity demand grows due to factors such as: the proliferation of electric vehicles, the electrification of residential homes and commercial buildings and the expansion of residential, commercial and industrial development brought on by population growth.
- Advance the state’s clean energy goals: The project is designed to transport renewable energy — such as solar, wind and battery storage — into Southern California. This helps the region meet California’s clean air and 2045 climate goals by enabling more renewable energy projects to be built and delivered to customers.
- Efficiently use existing corridors: The transmission line will primarily use existing rights-of-way, minimizing the need for new corridors and reducing potential environmental and community impacts.
- Economic and infrastructure investment: The project represents a significant infrastructure investment in the region, supporting jobs and economic activity throughout the development and construction phases and beyond.
- Prepare for future demand: By expanding transmission capacity, the project will enable the electric system to deliver additional clean energy where and when it is needed, supporting the region’s long-term economic vitality and sustainability.
SCE plans to submit an application to the California Public Utilities Commission in early 2027.
Following submission, key steps will include permitting, environmental review, route selection and continued stakeholder engagement. As part of the environmental review process, SCE will seek input from stakeholders, environmental agencies, local governments and other interested parties.
Regulatory approval is anticipated in 2028, with construction scheduled to begin in 2029.
The transmission line is projected to be in-service by June 1, 2034.
Status: Early planning phase details, such as routing and design, are still being evaluated.
SCE invites community members to learn about the proposed project, review preliminary information, understand the environmental and regulatory review process, ask questions and provide feedback to the project team.
SCE will remain in close contact with elected officials and agencies with jurisdiction over the project.
Opportunities to engage include:
• Community meetings to learn more and share feedback
• Formal input during the California Public Utilities Commission review process
• Ongoing coordination with cities, counties and public agencies
SCE will share project updates and welcome feedback as more details become available.
Community Meetings and Open Houses
Virtual Community Meeting
Monday, Nov. 30, 2026
6-7 p.m. Pacific Time
Online
Join SCE’s project team for an online presentation about the proposed project. Participants will be able to hear from project representatives, review preliminary project information and submit questions.
Register for the Virtual Community Meeting
In-Person Open Houses
During open house events, attendees will be able to:
- Learn about the purpose and need for the project
- Review preliminary project information and maps
- Understand the environmental and regulatory review processes
- Speak directly with project team members and subject matter experts
- Ask questions and provide feedback to the project team
| Date | Time | City | Location |
|---|---|---|---|
| Wednesday, Dec. 2, 2026 | 5:30-7:30 p.m. | Mission Viejo | Lake Mission Viejo Clubhouse 22555 Olympiad Road Mission Viejo, CA 92692 |
| Thursday, Dec. 3, 2026 | 5:30-7:30 p.m. | Ladera Ranch | Ladera Ranch Middle School 29551 Sienna Parkway Ladera Ranch, CA 92694 |
| Monday, Dec. 7, 2026 | 5:30-7:30 p.m. | Orange | Santiago Canyon College 8045 E. Chapman Avenue Orange, CA 92869 |
SCE
Phone: 1-866-785-7057
Email: ORTP@sce.com
Members of the news media may reach us at news@sce.com or 1-626-302-2255.
California Independent System Operator
Phone: 1-916-351-4400
General inquiries or technical issues: Online Contact Form
California Public Utilities Commission
San Francisco Public Advisor: 1-415-703-2074 or toll free 1-866-849-8391
Email: public.advisor@cpuc.ca.gov