Key Project Activities and Upcoming Events
The following list identifies key activities for Southern California Edison Company’s (SCE) Kaweah Project, Federal Energy Regulatory Commission (FERC) Project No. 298.
- December 23, 2019: SCE filed an Application for New License with FERC.
- April 15, 2020: FERC issued a Notice of Application Accepted for Filing, Soliciting Motions to Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions.
- May 20, 2024: FERC issued a Notice of Intent to Prepare an Environmental Assessment.
- June 12, 2024: FERC issued a Notice of Availability of Environmental Assessment and requested comments within 45 days of the notice.
- FERC is actively working to complete consultation related to the Endangered Species Act and Section 106 of the National Register of Historic Places.
Public portions of filings related to the Kaweah Project can be accessed via FERC’s eLibrary at https://www.ferc.gov/ferc-online/elibrary
Register online here to be notified via e-mail of new filings and issuances related to the Kaweah Project.
For questions related to the Kaweah Project, please contact Meg Richardson, SCE Licensing Manager/Project Lead at mary.m.richardson@sce.com or 626-238-2902.
Licensing Documents
Application for New License
Kaweah Application for New License Files
- PUBLIC_P-298_FERC_Cover_Letter
- PUBLIC_P-298_License_Application_Table_of_Contents
- PUBLIC_P-298_Vol_1_Non-E_Exhibits
- PUBLIC_P-298_Vol_3a_Exh_E_Sec_1-6
- PUBLIC_P-298_Vol_3b_Exh_E_Sec_7.0-7.6
- PUBLIC_P-298_Vol_3c_Exh_E_Sec_7.7-7.14
- PUBLIC_P-298_Vol_3d_Exh_E_Sec_8-15
- PUBLIC_P-298_Vol_3e_SD-A_Intro
- PUBLIC_P-298_Vol_3f_SD-A_AQ1-3
- PUBLIC_P-298_Vol_3g_SD-A_AQ4-6
- PUBLIC_P-298_Vol_3h_SD-A_AQ7-9
- PUBLIC_P-298_Vol_3i_SD-A_CUL1_Arch
- PUBLIC_P-298_Vol_3j_SD-A_CUL1_BuiltEnv
- PUBLIC_P-298_Vol_3k_SD-A_CUL1_Ethno
- PUBLIC_P-298_Vol_3l_SD-A_LAND1-3
- PUBLIC_P-298_Vol_3m_SD-A_REC1-2
- PUBLIC_P-298_Vol_3n_SD-A_TERR1-2
Relicensing Documents
FERC’s eLibrary contains all documents related to the Kaweah Project. Below are links to relicensing documents.
- SCE Updated Study Report Meeting Summary (PDF)
- SCE Updated Study Report (PDF)
- SCE Initial Study Report Meeting Summary (PDF)
- SCE Initial Study Report (PDF)
- SCE Revised Study Plan (PDF)
- SCE Proposed Study Plan (PDF)
- SCE Pre-Application Document
FERC’s eLibrary contains all documents related to the Kaweah Project. Below are links to relicensing documents.
- SCE Updated Study Report Meeting Summary (PDF)
- SCE Updated Study Report (PDF)
- SCE Initial Study Report Meeting Summary (PDF)
- SCE Initial Study Report (PDF)
- SCE Revised Study Plan (PDF)
- SCE Proposed Study Plan (PDF)
- SCE Pre-Application DocumentFERC Documents & Notices
- Notice of Availability of Environmental Assessment
- Notice of Intent to Prepare Environmental Assessment
- Notice of Ready for Environmental Analysis
- FERC Study Plan Determination (PDF)
- FERC Scoping Document 2 (PDF)
- FERC Notice of Commencement (PDF)
- FERC Scoping Document 1 (PDF)
- FERC Tribal Consultation Notice (PDF)
FERC Documents & Notices
- Notice of Availability of Environmental Assessment
- Notice of Intent to Prepare Environmental Assessment
- Notice of Ready for Environmental Analysis
- FERC Study Plan Determination (PDF)
- FERC Scoping Document 2 (PDF)
- FERC Notice of Commencement (PDF)
- FERC Scoping Document 1 (PDF)
- FERC Tribal Consultation Notice (PDF)
Meeting Materials
- Updated Study Report Meeting – November 6, 2019
- Stakeholder Meeting – September 10, 2019
- Initial Study Report Meeting - November 1, 2018
- FERC held two scoping meetings on March 14, 2017, and a site visit on March 15, 2017. Transcripts of FERC’s scoping meeting can be found on FERC’s eLibrary here
- Technical Study Plan Kickoff – March 1, 2018
- Initial Study Plan Meeting Materials – June 21, 2017
- Plenary Meeting Materials - February 24, 2016
- Plenary Meeting Materials - June 9, 2015
Reference Documents
Additional Links
| Name | Project Role | Address | Phone |
|---|---|---|---|
| Wayne Allen SCE | Principal Manager | 1515 Walnut Grove Ave. Rosemead, CA 91770 | 626-302-9741 |
| Martin Ostendorf SCE | Senior Manager | PO Box 100 54170 Mtn Spruce Road, P.O. Box 100 Big Creek, CA 93605 | 559-893-2033 |
| Meg Richardson SCE | Licensing Manager/Project Lead | 1515 Walnut Grove Ave. Rosemead, CA 91770 | 626-238-2902 |
| Becky Kipp FERC | Assigned Staff | -- | 202-502-8846 |
| Dan Keverline SCE | Operations and Maintenance | Kaweah Hydro Headquarters Kaweah 1 Powerhouse Three Rivers, CA 93271 | 760-376-3813 |
- Big Creek Hydro Licensing
- Bishop Creek Project Relicensing
- Borel Project Surrender (FERC P-382)
- Kern River No. 1 Project Relicensing (FERC No. 1930)
- Kern River No. 3 Hydroelectric Project (FERC No. 2290)
- Lee Vining Hydroelectric Project (FERC No. P-1388)
- Lundy Hydroelectric Project (FERC No. P-1390)
- Rush Creek Project Relicensing (FERC P-1389)
- FERC Standards of Conduct
- SCE Tariff Books
- Advice Letters
- SCE Manuals
- SCE Affiliate Notices
- Energy Efficiency Filings
- FERC Open Access Information
- SCE Load Profiles
- Renewable and Alternate Power
- Affiliate Transactions Audit Report
- M-438 Service Costs
- NERC Regulatory Information
- Regulatory Document Library
- Hydro Licensing
- EPIC
- E-5105 Data Documents
- Annual Reports on Electric Line Extension Expenditures
- Open Proceedings
- Energy Data - Reports and Compliance
- USWAG Notification