Correction to SCE Public Participation Hearings (PPHs) Venue Information in Long Beach
You may have previously seen a notice in your bill that Public Participation Hearings (PPHs) were occurring in the 2025 General Rate Case for Southern California Edison (SCE).  This is a proceeding before the California Public Utilities Commission and is referred to by case number A.23-05-010.  The information contained in the notice is correct, except the notice incorrectly stated that the date for the in-person PPHs in Long Beach is March 20, 2024.  The correct date for those in-person PPHs is April 10, 2024.

The corrected information for the in-person PPHs in Long Beach is as follows: 

Date: Wednesday, April 10, 2024 
Time: 2:00 p.m. and 6:00 p.m.
Location: Recreation Park Community Center, 4900 E. 7th St., Long Beach, CA 90804. 

For complete information regarding the Public Participation Hearings, click here.

Battery Energy Storage, Electric Vehicle Charging, and Solar System Safety

Battery Energy Storage Systems

If you're thinking about installing a Battery Energy Storage System (BESS) for your home or business, or if you have an existing BESS, you should be aware of important standards and practices to make sure your system is running safely. 

Click here to see BESS Safety Standards and Practices for Small Businesses and Residential Customers.

Click here to see BESS Safety Standards and Practices for Large Customers.

If you already installed a BESS, safety codes and industry standards may have changed since your system was installed. While not required, you may want to consider upgrading your BESS to meet the latest codes.

Expose as Block
No
Add Horizontal line
Off

Electric Vehicle (EV) Charging Systems

If you have or are considering installing an Electric Vehicle (EV) charging system, you should be aware of important standards and practices to make sure your system works safely.

Solar Systems

If you already have a solar system or want additional information about the installation process, you should be aware of important standards and practices to make sure your system operates safely. Please click here for more information.

Expose as Block
No
Add Horizontal line
Off

Legal Disclaimer

This material has been prepared for informational purposes only. You should consult your own engineering, construction or legal advisors before engaging in the installation of any BESS, EV Charging System, and/or solar power system. SCE makes no recommendations or representations regarding the quality or performance of any manufacturers, dealers, contractors, installers or materials.

ALL INFORMATION IS MADE AVAILABLE ON AN “AS IS” AND “AS AVAILABLE” BASIS. SCE MAKES NO WARRANTY AND HEREBY DISCLAIMS ALL WARRANTIES, WHETHER EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION AS TO THE COMPLETENESS OR ACCURACY OF ANY INFORMATION.