Skip to main content
Southern California Edison Southern California Edison
  • انقطاعات التيار والسلامة
  • انقطاعات التيار والسلامة
    • الإبلاغ عن انقطاع التيار أو مشكلة تتعلق بالسلامة
      • الإبلاغ عن انقطاع الخدمة
      • الإبلاغ عن خط كهرباء معطل
      • الإبلاغ عن إنارة الشوارع
    • مركز الانقطاع
      • Check Outage Status
      • احصل على التنبيهات
      • Our Service Guarantee
    • الاستعداد للانقطاع
      • نصائح انقطاع
      • برنامج البطارية الاحتياطية للعناية الحرجة
      • Battery Energy Storage System (BESS)
      • Outage Types
    • Stay Safe
      • Outdoor Tips
      • Your Family's Safety
      • Power Lines & Trees
      • Stay Safe from Scams
    • Safety Resources & Support
      • Support During Emergencies
      • Access & Functional Needs
      • Community Resource Center
      • Cooling Center Locations
      • Backup Power Solutions
      • Training & Education
    • Wildfire Safety
      • Wildfire Mitigation Efforts
      • Weather & Fire Detection
      • Safety-Related Planned Outages
      • Wildfire Communications Center
      • Critical Facilities & Critical Infrastructure
      • Grid Hardening
  • Save Money
  • Save Money
    • Income Qualified Programs
      • CARE & FERA
      • Energy Savings Assistance Program
      • Arrearage Management Plan
    • Rebates & Financial Assistance
      • Bill Assistance Programs
      • Rebates & SCE Marketplace
    • Savings Programs
      • Ways to Save at Home
      • Enroll in Savings Programs
      • Keeping Bills Manageable
    • Rates & Financing
      • Residential Rate Plans & Details
      • Rate Plan Comparison Tool
      • Electric Vehicle Plans
      • Multifamily Rates & Billing
      • SCE Rate Advisory
  • Clean Energy & Efficiency
  • Clean Energy & Efficiency
    • Efficiency at Home
      • Benefits of an Electric Home
      • Energy Efficiency Financing
      • Energy Management Center
      • Home Efficiency Guide
      • Clean Energy & You
      • Community Renewables Program
    • Electric Vehicles
      • Getting Started
      • EV Rebates & Rates
      • Charging Your EV
      • EVs for Business
    • Solar - Generating Your Own Power
      • Solar Power Basics
      • Self-Generation Incentive Program
      • Billing & Incentives
    • Energy Education
      • Class Categories & Descriptions
      • Education & Experience Centers
      • Foodservice Technology Center
      • Technology Test Center
    • Workforce Development
      • Career Insights
      • Education Programs
      • Financial Support
      • Job Resources
      • Research & Resources
      • Training
  • For Business
  • For Business
    • Smart Energy & Solar
      • Solar for Business
      • EVs for Business
      • Energy Efficiency Programs
    • Save Costs & Energy
      • Savings Strategies for Businesses
      • Enroll in Cost Savings Programs
      • Economic Development Assistance
      • Savings By Business Type
    • Rates & Financing
      • Business Rate Plans
      • Rate Comparison Tool
      • Energy Efficiency Financing Options
    • Business Community Resources
      • Business Resources
      • Business Consulting Services
      • Energy Education Centers
      • Workforce Development
search icon
avatar-icon avatar-icon
حسابي
سجّل الدخول / قم بالتسجيل في SCE.com لدفع فواتيرك، والتحقق من استخدامك، والمزيد!

New to SCE.com?

التسجيل
Hi, John
لوحة التحكم الخاصة بي
تسجيل الخروج
  • حسابي
    • My Account
      • Bills & Usage
      • Payments
      • Account Settings
    • Rate Plans
      • Time-Of-Use Plans
      • Tiered Rate Plan
    • Construction & Renovation
      • Submit a New Request
      • Project Portal
      • SCE Project Center
    • Bill Assistance & Savings
      • One-time Bill Assistance
      • Income-Qualified Programs
      • Households Dependent on Medical Equipment
    • Customer Service Center
      • Billing & Payments
      • Move Center
      • Community Choice Aggregation
      • Help Center
      • Claims, Forms & Requests
SDP Terms & Conditions
this element added for skip to main content issue fixes

Eligibility & Requirements

  1. The Summer Discount Plan (SDP) program is subject to the availability of cycling devices and adequate device signal strength at your location.
  2. The Summer Discount Plan is not recommended for anyone unable to tolerate high temperatures or who has health problems such as asthma, heart disease, or respiratory conditions.
    If you currently receive a medical baseline allocation for air conditioning, or if you are on the DM, DMS-1, DMS-2, DMS-3, or DS domestic rates, you are not eligible to participate in the Summer Discount Plan. If you are participating in the Smart Energy Program, you are not eligible to enroll in the Summer Discount Plan.
    To participate, your central air conditioner must be in good working order at enrollment and throughout your participation. Cycling devices will not be installed on non-operational air conditioners. If your central air conditioner becomes inoperable while you are participating in the Summer Discount Plan, you should have it repaired immediately. If it is discovered that your air conditioner is not in good working order or that you have tampered with the cycling device, your service account may be removed from the program. If you have any rooftop air conditioners on the Summer Discount Plan, you will not be eligible for the “override” options.
    If you are a tenant, you are responsible for determining whether your property owner or manager’s approval is required for the installation and operation of the cycling device. If so, you are responsible for obtaining this approval before submitting your application to us.
    Except for existing SDP customers with an installed interval data recorder (IDR) meter capable of registering hourly interval usage data before January 1, 2017, all existing and new customers must have an Edison SmartConnect® meter installed and program ready to participate in SDP.
    Your account must register the use of a minimum of 1.5 kWh, one hour before or after, in at least one SDP event per calendar year to remain eligible to participate in the SDP Program. This requirement is known as “the Minimum Usage Requirement.” An annual review of customer’s electric usage will be conducted by SCE no later than January 31 of each calendar year. At the annual review time, SCE will determine in its reasonable discretion if a customer has met the Minimum Usage Requirement. If removed from the program for failing to meet the Minimum Usage Requirement, you will not be allowed to re-enroll for the following 12-month period.

Participation Period

There is a 1-year minimum participation period requirement, starting on the activation date of your cycling device unless the program is suspended, modified, or terminated by the CPUC. If during the 1-year period, you, or someone in your household, develop a medical condition that disqualifies you from participating in the program, as substantiated by a medical provider, you may also request to be removed from the Summer Discount Plan. Your enrollment will be continuous unless, after the conclusion of the 1-year minimum participation period, you notify us that you wish to terminate.

Bill Credits

Bill credits will be calculated based on these factors: 

  1. Your current rate schedules
    The size of your central air conditioner(s) being cycled - the greater the calculated tonnage, the larger the credit
    The option you select, “standard” or “override”
    The option you select, Maximum Savings (100%) or Maximum Comfort (50%)
    The amount of electricity you use

Maximum credits based on enrollment in the program from June 1 to October 1. Enrollment after June 1 will result in prorated credits beginning from the first meter read date after your application is processed and your device is installed and activated.

Summer Discount Plan credit amounts and program options are subject to change pursuant to the California Public Utilities Commission (CPUC).

Duration of Shut-Off Cycling

Under the Maximum Savings option, your A/C may be shut off for up to 6 hours per day. Under the Maximum Comfort option, your A/C may be shut off for 15 minutes of every half hour, for up to 6 hours per day. In the event of a system emergency, we may, at our discretion, extend the cycling period beyond the 6-hour duration limit. However, no new energy event will be initiated after the 6-hour limit has been met.

Total Shut-Off Hours Per Year

The maximum length of time that your A/C may be cycled off is 180 hours per year.

Complete Tariff Information

This information is meant as an aid to understanding SCE’s Summer Discount Plan. It does not replace the CPUC-approved tariffs. Any inconsistencies between this material and SCE’s tariffs are unintended, and the tariffs prevail. Please refer to SCE’s Tariff Books for a complete list of terms and conditions of service.

The credit amount and program options are subject to change by the California Public Utilities Commission (CPUC). This program is funded by California utility customers and administered by Southern California Edison under the auspices of the California Public Utilities Commission. © 2020 Southern California Edison. All rights reserved.

Summer Discount Plan Disclaimer

PLEASE NOTE: No authorized SCE representative will ever ask you to pay for advice on how to save money or energy through our programs.

*The estimated bill credit amounts represent the savings a resident could enjoy with a typical 4.5-ton air conditioning unit. The credit could increase with larger units, decrease for smaller ones, and vary based on individual participation levels and equipment type. Credits are based on enrollment in the program from June 1 to October 1. Enrollment after June 1 will result in prorated savings beginning from the first meter-read date after your application is processed and your device is installed, verified, and activated. SCE may need to test the device. The credit amounts and program options are subject to change by the California Public Utilities Commission (CPUC).

A customer must have an Edison SmartConnect® meter capable of registering hourly interval usage data for enrollment in the SDP program. Customers removed from the program for failing to meet the minimum electric usage requirement will not be allowed to re-enroll for the following 12-month period. Customers receiving a medical baseline allocation for air-conditioning under Schedule MB-E are not eligible to participate in the Summer Discount Plan program.

If participating in the Smart Energy Program, you are not eligible to enroll in the Summer Discount Plan. Net Energy Metering (NEM) credits received under Schedule NEM may offset in whole or in part the program credits associated with the Summer Discount Plan. This information is meant as an aid to understanding SCE’s Summer Discount Plan program. It does not replace SCE’s CPUC-approved tariffs. Any inconsistencies between this material and SCE’s tariffs are unintended, and the tariffs prevail. Please refer to SCE’s tariff books at sce.com/sdptariff for a complete list of terms and conditions of service.

The credit calculation formula is Single Phase (Amps x Volts)/ 1,400 + .09 = Tons. Amps and Volts values are based on the AC unit’s faceplate or, when not available, readings from an amperage probe clamp.

People Also Read
  • Automated Benchmarking Service
  • Budget Assistant Terms & Conditions
  • Income Qualified Programs: Rate Discount Application Terms & Conditions
  • Customer Data Access Terms & Conditions
  • EAF Terms & Conditions
  • Energy Savings Assistance Program Terms & Conditions
  • Green Rates Terms & Conditions
  • Home & Business Area Network Device Registration Terms & Conditions
  • Marketing Messaging & Alerts SMS Terms & Conditions
  • My Account Online Services Terms & Conditions
  • On-Bill Financing Terms and Conditions
  • Online Services, Billing, Payment & Direct Payment Terms & Conditions
  • Outage Alerts Terms & Conditions
  • Residential Rate Analysis Terms and Conditions
  • SCE Website Terms of Use
  • SEP Terms & Conditions, & Disclaimer
  • Transactional Text Messaging Terms & Conditions
اللغة:
  • English
  • ESPAÑOL
  • 한국어
  • 中文
  • TIẾNG VIỆT
  • Tagalog
  • عربى
  • հայերեն
  • فارسی
  • Français
  • Deutsch
  • 日本語
  • ខ្មែរ
  • ਪੰਜਾਬੀ
  • русский
  • Português
  • हिंदी
  • Hmong
  • Thai

حول SCE

  • حوكمة الشركات
  • عطاء المجتمع
  • البيئة
  • الوثوقية
  • شراء الطاقة
  • معلومات تنظيمية
  • Open Noticed CPUC Proceedings
  • إمكانية الوصول

الشركاء

  • مزودي الطاقة من جهات خارجية
  • Developers & Builders
  • الموارد
  • Project Requests
  • Installation Management Services (Telecom)
  • Power Capacity and Availability

مركز خدمة العملاء

  • الفواتير والمدفوعات
  • مركز الحركة
  • مركز المساعدة
  • Construction & Renovation
  • Submit Claims, Forms & Requests
  • ترشيد الطاقة
  • مجموعة خيارات المجتمع
  • Catalina Island Utility Services
  • Edison International
  • مشحون بالطاقة من إديسون
  • Newsroom
  • الوظائف
  • Facebook
  • Instagram
  • X
  • LinkedIn
  • YouTube
Southern California Edison
header line
Energy for What's Ahead ®
الشروط والأحكام
إشعار الخصوصية
طلب معلومات شخصية
قانون حقوق الطبع والنشر

©  copyright شركة جنوب كاليفورنيا إديسون