Hydro Relicensing

Kaweah Project Relicensing (FERC P-298)

null

Key Project Activities and Upcoming Events

  • On December 23, 2019, in accordance with 18 CFR §5.18, Southern California Edison Company (SCE) filed with the Federal Energy Regulatory Commission (FERC or Commission) an Application for New License (License Application) for the Kaweah Project (Project), FERC Project No. 298. SCE e-filed the License Application with the Commission.

    The License Application is comprised of six volumes, including public, critical energy infrastructure information (CEII), confidential, and privileged information. Public portions of the License Application (Volumes 1 and 3) are available for review/download using the links below. In addition, public portions of the License Application can be accessed at the following locations: FERC’s eLibrary at www.ferc.gov/docs-filing/elibrary.asp; by appointment at SCE’s Kaweah Hydro Headquarters Office – Carpenter’s Shop, 44511 Sierra Drive, Three Rivers, CA 93271 (to schedule an appointment contact David Moore at david.moore@sce.com or 626-302-9494); and at the Three Rivers Branch Library, 42052 Eggers Drive, Three Rivers, CA 93271.

    Refer to the FERC Cover Letter and Table of Contents links below for additional information. If you have questions regarding this filing please contact David Moore, SCE Relicensing Project Manager, by phone at (626) 302-9494 or via e-mail at david.moore@sce.com.

  • Current FERC Process Plan and Schedule
  • Register online here to be notified via e-mail of new filings and issuances related to the Kaweah Project.

Application for New License

Kaweah Project Application for New License (Public Information)

Volume 1: Initial Statement, Exhibits A, B, C, D, G, and H

Volume 3: Exhibit E

Volume 3: Supporting Document A

Contact Us

Name Company Project Role Address Email Phone
Wayne Allen SCE Principal Manager 1515 Walnut Grove Ave. Rosemead, CA 91770 wayne.allen@sce.com 626-302-9741
David Moore SCE Project Lead 1515 Walnut Grove Ave. Rosemead, CA 91770 david.moore@sce.com 626-302-9494
Jim Hastreiter FERC Assigned Staff   James.hastreiter@ferc.gov 503-552-2760
Dan Keverline SCE Operations and Maintenance Kaweah Hydro Headquarters Kaweah 1 Powerhouse Three Rivers, CA 93271 keverlds@sce.com 760-376-3813