Outage Notifications Alert
We are aware multiple outage notifications are inadvertently being sent to customers. We are working to resolve this as soon as possible and apologize for the inconvenience.

Hydro Licensing

Bishop Creek Project Relicensing (FERC P-1394)

null

Please sign up to receive e-mails about the Project using our Contact Registration Form.

Below are links to project-related materials, notifications, and documentation (provided as PDFs). All documents related to the Bishop Creek Project can also be found on FERC’s eLibrary. This page will be updated throughout the relicensing process as new materials become available or are updated.

Register online here to be notified via e-mail of new FERC filings and issuances related to the Bishop Creek Project.

Recreation Survey

As part of the relicensing process, SCE is working with the USFS to gather information about recreation opportunities related to the Bishop Creek Hydroelectric Project, specifically at Lake Sabrina, South Lake, and Intake No. 2 Reservoir. The information you provide at the link below will be anonymous and help guide current and future management of recreation opportunities, sites, and facilities for visitors to the Bishop Creek Reservoirs. Please use this link to access the survey.

Relicensing Documents

Pre-Application Document

On May 1, 2019, Southern California Edison Company filed with the Federal Energy Regulatory Commission (FERC) its formal Notice of Intent (NOI) to file an Application for New License for the Bishop Creek Project (FERC Project No. 1394) and a Pre-Application Document (PAD). These documents were e-filed with FERC and are available through FERC’s eLibrary or available for download below. If you have difficulty accessing or downloading files please contact Matt Woodhall at 626-302-9596 or matthew.woodhall@sce.com.

Study Plan Determination

  • SCE request for expedited study plan determination: On September 4, 2019, SCE filed a letter requesting a waiver of sections 5.11 and 5.12 of the FERC’s regulations to expedite the study plan process. The waiver was intended to shorten the study plan determination process by four months to provide more time for SCE and the stakeholders to collaboratively assess project effects and develop proposed license conditions during the pre-filing period. On October 3, 2019, FERC staff granted the waiver request and established a deadline of October 18, 2019, for stakeholders to file comments on the RSP. No comments on the revised study plan were filed.
  • FERC Study Plan Determination: On November 4, 2019, SCE’s Revised Study Plan was approved, with one FERC staff-recommended modification (discussed in Appendix B).

Initial Study Report

The Initial Study Report (ISR) marks the 1-year anniversary of FERC’s study plan determination as required by 18 Code of Federal Regulation (CFR) 5.15(c). The ISR (1) describes overall progress in implementing the approved Study Plan, (2) provides an update on the schedule for implementing the studies, and (3) describes the data collected thus far. The ISR is not intended to analyze results for purposes of determining Project effects, nor does it discuss potential protection, mitigation, and enhancement (PME) measures. The ISR and associated meeting are intended to provide an opportunity to review progress in implementing the approved study plans and provide an opportunity for stakeholders to suggest modification or additional areas of inquiry that are needed to have an informed discussion of Project effects.

Progress Reports

As outlined in the Technical Study Plan, these quarterly reports are distributed to the Technical Working Groups and FERC and are intended to be brief, technical memoranda that will summarize work completed to date, any deviations from previously described methods, and any unforeseen issues that may warrant further stakeholder consultation.

Contact Us

Name Company Project Role Address Email Phone
General Information       bishopcreek@sce.com 800-257-1048
Wayne Allen SCE Principal Manager 1515 Walnut Grove Ave. Rosemead, CA 91770 wayne.allen@sce.com 626-302-9741
Matthew Woodhall SCE Project Lead 1515 Walnut Grove Ave. Rosemead, CA 91770 matthew.woodhall@sce.com 626-302-9596
Kelly Wolcott FERC FERC D.C.   Kelly.wolcott@ferc.gov 202-502-6480
Samantha Nelson SCE Operations and Maintenance Bishop Hydro Offices Plant 4, Bishop CA 93514 samantha.nelson@sce.com 760-873-0724