我們應對COVID-19
我們為應對COVID-19採取了一些調整,包括暫停住宅和小型企業客戶因未付款的服務中斷,並且僅繼續進行保護公共安全和減少森林火災的風險所需要的關鍵工作。了解更多. 如果您最近失業,即使您正在領取失業救濟金,也可能有資格通過我們的CARE或FERA計劃獲得降低能源費率 了解更多。

Banducci Substation Project

null

The Banducci Substation Project is needed to meet future electricity needs in the Cummings Valley area. The project will also provide the additional benefit of enhancing electrical system reliability and operational flexibility in this region.