How to Submit a Claim to SCE

If you have suffered a loss or damage due to recent service interruption, and believe we may be responsible, you may submit a claim. How to submit your claim >

We investigate and evaluate each claim individually, and our policy is to respond promptly.

Long Beach Update

At this time, the majority of customers have been restored. A plan has been developed to assess and temperature test the underground system in downtown Long Beach. Crews will perform these inspections throughout the city and unless we discover additional problems, we anticipate having everyone’s service restored by 6 p.m. The safety of the public and our crews remain our highest priority. We thank the city of Long Beach for its cooperation and for the safety efforts of first responders in the Long Beach Fire and Police departments. Get the latest update >

Regulatory Information - SCE Load Profiles

SCE Dynamic Load Profiles

The data files in this section are dynamic load profiles for residential (Domestic-Single/Multiple), Small Commercial (GS-1), and medium commercial/industrial (GS-2) customers.

On May 18, 1998, SCE began implementing dynamic load profiles in place of static profiles for these three rate groups. As of that date, only dynamic profiles should be used for billing or settlement.

Though dynamic load profiles are posted from April 1, 1998, those prior to May 18 are test samples and should not be used in billing or settlement.

All SCE rate group load profiles are reported in Pacific Standard Time (PST), with hourly values recorded in kW.

To review the definition of a Rate Schedule, select the schedule for the appropriate Load Profile Id presented below.

Dynamic Load Profiles
Customer Class (Rate Group) Load Profile Id (text Files) Description Rate Schedules
Domestic DOM-S/M Residential.
Domestic Single/Multiple
D-CARE, D-CARE-SDP, D-CARE-SDP-O, D-FERA, D-FERA-SDP, D-FERA-SDP-O, D-PG-S, D-S, D-S-CARE, D-S-FERA, D-SDP, D-SDP-O, DE, DE-FERA, DE-FERA-SDP, DE-FERA-SDPO, DE-S, DE-SDP, DE-SDP-O, DOMESTIC, TD-A-C-SDP, TD-B-C-SDP, TD-TEV-C-SDP, TD-TEV-SDP, TD-TEV-SDPO, TDE-TEV-SDP, TDE-TEV-SDPO, TOU-D-A, TOU-D-A-C, TOU-D-A-SDP, TOU-D-A-SDPO, TOU-D-B, TOU-D-B-C, TOU-D-B-SDP, TOU-D-T, TOU-D-T-CARE, TOU-D-T-SDP, TOU-D-T-SDPO, TOU-D-TEV, TOU-D-TEV-C, TOU-DE-A, TOU-DE-A-SDP, TOU-DE-B, TOU-DE-B-SDP, TOU-DE-T, TOU-DE-T-SDP, TOU-DE-TEV, TOU-DET-SDPO, TOU-DT-C-SDP, TOU-DT-C-SO, TOU-EV-1
Lighting, Small, and Medium Power (LSMP) GS-1 General Service, Non-demand Metered, Small Commercial GS-1, GS-1-APS-E, GS-1-CIF, GS-1-G-S, GS-1-SCE, TGS1-RTP, TOU-EV-3, TOU-EV-3-A, TOU-GS1A, TOU-GS1A-AE, TOU-GS1A-AEC, TOU-GS1A-C, TOU-GS1B, TOU-GS1B-AE, TOU-GS1B-AEC, TOU-GS1B-C, TOU-GS1B-S
Lighting, Small, and Medium Power (LSMP) GS-2 General Service, Demand Metered, Medium Commercial/Industrial GS-2, GS-2-AE/GS1, GS-2-APS-E, GS-2-CARE, GS-2-SCE, GS-2/GS1, TOU-EV-4, TOU-GS2A, TOU-GS2A-AE, TOU-GS2A-AEC, TOU-GS2A-C, TOU-GS2B, TOU-GS2B-AE, TOU-GS2B-AEC, TOU-GS2B-C, TOU-GS2B-EDW, TOU-GS2B-S, TOU-GS2B-SAE, TOU-GS2R, TOU-GS2R-AE

Load Profiles (text files)

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

1998

If you have any questions regarding SCE load profiling, please contact Cyrus Sorooshian at SCE.