How to Submit a Claim to SCE

If you have suffered a loss or damage due to recent service interruption, and believe we may be responsible, you may submit a claim. How to submit your claim >

We investigate and evaluate each claim individually, and our policy is to respond promptly.

Long Beach Update

As of Friday night, we have restored service to most of the 260 customers that were without service by connecting generators. The handful of remaining customers will be without power overnight. Unfortunately, some locations are not able to be connected to generators because of equipment issues at the building or the location's accessibility. Our crews have made significant progress conducting detailed inspections on more than 300 vaults. As of 10 pm, 94% of these inspections have been completed. Once inspections are complete, the results will be analyzed and a network remediation plan will be developed. We continue to make repairs on the equipment. We encourage customers in Long Beach to make every effort to conserve use of electricity as we continue to return the system to its full operational capacity. The safety of the public and our crews remain our highest priority. We thank the city of Long Beach for its cooperation and for the safety efforts of first responders in the Long Beach Fire and Police departments. Get the latest update >

Regulatory Information - SCE Load Profiles

1999 Static Load Profiles

The data files in this section are static load profiles for 1999. Each file is a rate group annual profile developed using a three-year average of historical rate group load profiles. These load profiles are based on the 1994-1996 class average load profiles for 11 separate groups. Refer to the methodology of creating static load profiles for a description of the estimation process.

On May 18, 1998, SCE began implementing dynamic load profiles in place of static profiles for residential (Domestic Single/Multiple), Small Commercial (GS-1), and medium commercial/industrial (GS-2) customers. As of that date, only dynamic profiles should be used for billing or settlement for these three rate groups.

All SCE rate group load profiles are reported in Pacific Standard Time (PST), with hourly values recorded in kW.

 

1999 Static Load Profiles
Customer Class (Rate Group) Load Profile Id (text Files) Description Rate Schedules
Domestic DOM-S/M Domestic Single/Multiple. D, D-CARE, DE, DS, TOU-D-1, TOU-D-2,TOU-EV-1, TOU-EV-2.
Domestic DOM-MM Master-Metered DM, DMS-1, DMS-2, DMS-3.
LSMP GS-1 General Service,Non-demand Metered,Small Commercial GS-1, TOU-GS-1, TOU-EV-3.
LSMP TC-1 Traffic Control TC-1
LSMP GS-2 General Service,Demand Metered, Medium Commercial/Industrial GS-2, GS-2-RTP, RTP-2-GS, RTP-3-GS,TOU-EV-4.
LSMP TOU-GS General Service,Time-of-Use, Medium Commercial/Industrial TOU-GS-2, TOU-GS-2-SOP.
AG&P PA-1 Small Agriculture & Pumping PA-1
AG&P PA-2 Agriculture & Pumping,Demand Metered PA-2
AG&P TOU-PA-5 Agriculture & Pumping, Time-of-Use TOU-PA-5.
AG&P Ag-TOU Agriculture & Pumping,Time-of-Use PA-RTP, TOU-PA, TOU-PA-3, TOU-PA-4, TOU-PA-6, TOU-PA-7, TOU-PA-SOP, TOU-PA-SOP-I.
Large Power TOU8-SEC General Service,Time-of-Use,Large Power(>500 kW), Secondary Voltage (Below 2 kv) TOU-8-S, I-6-S, RTP-2-S, RTP-2-I-S, RTP-3-S, TOU-8-CR-1-S, TOU-8-RTP-S, TOU-8-SOP-S, TOU-SOP-I-S, TOU-8-SOP-RTP-S.
Large Power TOU8-PRI General Service,Time-of-Use,Large Power(>500 kW),Primary Voltage (2 kv - 50 kv) TOU-8-P, I-6-P, RTP-2-P, RTP-2-I-P, RTP-3-P, TOU-8-CR-1-P, TOU-8-RTP-P, TOU-8-SOP-P, TOU-SOP-I-P, TOU-8-SOP-RTP-P.
Large Power TOU8-SUB General Service,Time-of-Use,Large Power(>500 kW), Sub-Transmission Voltage (Above 50 kv) TOU-8-T, I-6-T, RTP-2-T, RTP-2-I-T, RTP-3-T, TOU-8-CR-1-T, TOU-8-RTP-T, TOU-8-SOP-T, TOU-SOP-I-T, TOU-8-SOP-RTP-T.
Street Lighting St-Ltng Street and Area Lighting AL-1, DWL, LS-1, LS-2, LS-3, OL-1.

If you have any questions regarding SCE load profiling, please contact Cyrus Sorooshian at SCE.