CORRECTION
In-Person Public Participation Hearings (PPHs) is on 4/10  in Long Beach.
Date: Wednesday, April 10, 2024 
Time: 2:00 p.m. and 6:00 p.m.
Location: Recreation Park Community Center, 4900 E. 7th St., Long Beach, CA 90804. 

The previous notice for the in-person SCE Public Participation Hearings before the California Public Utilities Commission for the 2025 General Rate Case (A.23-05-010) had an incorrect date. For complete information click here.

Presidential Substation Project

null

Infrastructure to Meet Electricity Demand in Southern Ventura County

The existing electrical infrastructure serving Simi Valley, Thousand Oaks, and adjacent areas of unincorporated Ventura County must be upgraded for ongoing safe, reliable power in these growing areas. This project is designed to increase electrical capacity, maintain system reliability and serve the area’s projected needs.

Simi Valley, Thousand Oaks, and adjacent areas of unincorporated Ventura Country.

The proposed Presidential Substation project will primarily consist of System Alternative A:

  • upgrading Potrero and Royal Substations with higher capacity equipment
  • adding additional 16 kV distribution circuits

California Public Utilities Commission granted SCE a permit to construct the Presidential Substation Project configured as "System Alternative A" on March 13, 2014.

  • March, 2013: CPUC published Final EIR
  • March, 2014: CPUC granted permit to construct

If you have any questions or comments, please call the following hotline number: 866-785-7057.

Interested in working with SCE as a supplier? Learn more.

Resources

For More Information