CORRECTION
In-Person Public Participation Hearings (PPHs) is on 4/10  in Long Beach.
Date: Wednesday, April 10, 2024 
Time: 2:00 p.m. and 6:00 p.m.
Location: Recreation Park Community Center, 4900 E. 7th St., Long Beach, CA 90804. 

The previous notice for the in-person SCE Public Participation Hearings before the California Public Utilities Commission for the 2025 General Rate Case (A.23-05-010) had an incorrect date. For complete information click here.

Santa Barbara County Reliability Project

null

Boosting Power Reliability During Emergency Conditions

This infrastructure project is needed to increase reliability to meet electrical demands of the south coast of Santa Barbara County during emergency conditions, while also enhancing operational flexibility.  This area includes Goleta, Carpenteria, and Santa Barbara. Significant portions of this improvement work have already been completed along Segments 1, 2 and 3A. To complete this work on our existing line, we must take some additional steps with both the CPUC and local government.

Santa Barbara County, Ventura County, City of Carpinteria

The Project consists of the following major components:

  • Reconstruction of existing 66 kV sub-transmission facilities primarily within existing utility rights-of-way (ROW) between the existing Santa Clara Substation in Ventura County and the existing Carpinteria Substation located in the City of Carpinteria in Santa Barbara County
  • Modify utility equipment within the existing Santa Clara Substation, Goleta Substation, Getty Substation, Casitas Substation, Ortega Substation, Isla Vista Substation, Santa Barbara Substation, and Carpinteria Substation
  • Installation of fiber optic telecommunications equipment for the protection, monitoring, and control of sub-transmission and substation equipment

  • 2nd Quarter 2017: SCE expects to acquire permits for work to be performed in the Coastal Zone and the Los Padres National Forest.
  • 3rd Quarter 2017: SCE expects to begin construction.
  • 4th Quarter 2018: All work segments are expected to be in service

If you have questions about this project, please call our toll-free project hotline at 1-866-464-2005.

Interested in working with SCE as a supplier? Learn more.