| If you use 70% or more of your electricity for agricultural purposes or for water or sewage pumping, and your maximum demand is 500 kW or less, you can receive service under one of these rate schedules.
|
|
 |
An Important Definition to Understand Before You Read Further
Some of SCE's agricultural and pumping rate schedules have service charges per horsepower of connected load. Service charges apply in every billing period, including months when little or no energy is used. SCE's other agricultural and pumping rate schedules have demand charges per kilowatt (kW) of maximum demand. Service and demand charges reflect the cost of having transmission and distribution facilities available to meet customer demand whenever it might occur.
Agricultural and Pumping Rate Schedules
Rate Schedule TOU-PA Rate A, Connected Load Option
Southern California Edison's (SCE's) TOU-PA Rate A, connected load option, is available for customers who use 70 percent or more of their electricity for agricultural, or for water or sewage pumping, and none of the remaining electrical consumption for domestic purposes. Maximum demand must not exceed 500 kilowatts (kW), unless the customer pumps large amounts of water, with 70 percent or more of the water used for agricultural purposes.
The link below provides more information on this program:
Rate Schedule TOU-PA Rate A, Connected Load Option
TOP
Rate Schedule TOU-PA Rate B, Demand Metered Option
Southern California Edison's (SCE's) TOU-PA Rate B, demand metered option, is available for customers who use 70 percent or more of their electricity for agricultural, or for water or sewage pumping, and none of the remaining electrical consumption for domestic purposes. Maximum demand must not exceed 500 kilowatts (kW), unless the customer pumps large amounts of water, with 70 percent or more of the water used for agricultural purposes.
The link below provides more information on this program:
Rate Schedule TOU-PA Rate B, Demand Metered Option
TOP
Rate Schedule TOU-PA-5
Southern California Edison's (SCE's) rate schedule TOU-PA-5 is an option for customers who use 70 percent or more of their electricity for agriculture, or for water or sewage pumping, and none of their remaining electrical consumption for domestic purposes. To be eligible for this rate, a customer must have a minimum of 35 horsepower (hp) of total power connected to the SCE system or 35 kilowatts (kW) of maximum power demand. Maximum power demand must not exceed 500 kW, unless the customer pumps large amounts of water, with 70 percent or more of the water used for agricultural purposes.
The link below provides more information on this program:
Rate Schedule TOU-PA-5: Time-of-Use, Agricultural and Pumping, Demand Metered
TOP
Rate Schedule TOU-PA-SOP
Southern California Edison's (SCE's) rate schedule TOU-PA-SOP is an option for customers who use 70 percent or more of their electricity for agriculture, or for water or sewage pumping, and none of their remaining electrical consumption for domestic purposes. Maximum power demand must not exceed 500 kilowatts (kW), unless the customer pumps large amounts of water, with 70 percent or more of the water used for agricultural purposes. Electrical usage during the Super-Off Peak (SOP) hours, between midnight and 6 a.m., is priced at the lowest rate.
The link below provides more information on this program:
Rate Schedule TOU-PA-SOP: Time-Of-Use, Agricultural and Pumping, Super Off-Peak, Demand Metered
TOP
Rate Schedule TOU-PA-7
Southern California Edison's TOU-PA-7 pricing option provides agricultural customers who are thinking of converting to diesel or natural gas engines with a pricing option that can match the cost of those non-electric power sources.
The link below provides more information on this program:
Rate Schedule TOU-PA-7: Agricultural Water Pumping -Large, Alternate Power Source
TOP
Rate Schedule AP-I
The AP-I pricing option provides a monthly credit to customers who are willing to interrupt power usage at SCE's request. This option is offered on a contract basis to eligible agricultural and pumping customers with a power demand of 50 kW or greater, or with 50 horsepower or greater of connected load.
The link below provides more information on this program:
AP-I Pricing Option
TOP
Rate Schedule PA-1
Southern California Edison's Schedule PA-1 is designed for agricultural and pumping customers who use 70 percent or more of their electricity to provide power for agricultural purposes or water or sewage pumping, and none of the remaining load is used for domestic purposes. This schedule is not applicable when the monthly registered demand has, or is expected to, exceed 500 kW three times in any 12-month period.
The link below provides more information on this rate schedule:
Rate Schedule PA-1
TOP
Rate Schedule PA-2
Southern California Edison's Schedule PA-2 is a basic rate schedule for customers who use 70 percent or more of their electricity for agricultural purposes or water or sewage pumping, and where none of the remaining load is used for domestic purposes. Except for large water pumping customers where 70 percent or more of the water pumped is used for agricultural purposes, this schedule is not applicable when the monthly registered demand is expected to exceed 500 kW or has exceeded 500 kW three times in any 12-month period.
The link below provides more information on this rate schedule:
Rate Schedule PA-2
TOP