Below are SCE's Advice Letters and their associated tariffs and/or attachments approved by the California Public Utilities Commission. For more information, please contact Jim Yee in SCE's Regulatory Policy and Affairs Department at (626) 302-2509. |
 |
Electric: |
- Advice 2285-E, Tariff Revisions to Reflect an Increase in Income Tax Component of Contribution Tax Factor
- Advice 2277-E, Establishment of the Edison SmartConnect Balancing Account and Modification to the Existing Results Sharing Memorandum Account in Compliance With Decision No. 08-09-039
- Advice 2271-E, Establishment of Programmable Communicating Thermostat Program and Schedule PCT, Programmable Communicating Thermostat
- Advice 2270-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month November 2008 of Southern California Edison Company
- Advice 2268-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month October 2008 of Southern California Edison Company
- Advice 2267-E, General Clean-Up Filing to Modify Various Tariffs
- Advice 2265-E, Proposed Addition to the Final Performance Data Provider (PDP) Protocols Jointly Submitted by the California Solar Initiative (CSI) Program Administrators (PAs) on July 30, 2008
Advice 2265-E was approved through Resolution E-4205 by the Commission Conference Hearing held on November 6, 2008
- Advice 2264-E, Establishment of the Cost of Capital Mechanism in Compliance With Decision 08-05-035
- Advice 2263-E, Phase-Out of Schedule I-6, Time-Of-Use General Service Large Interruptible, Pursuant to SCE's 2006 General Rate Case Settlement Agreement, as Authorized in Decision 06-06-067
- Advice 2261-E, Submission of Southern California Edison Company's Twelfth Gas Supply Plan for the State of California Department of Water Resources Tolling Agreements Pursuant to Decision 03-04-029
- Advice 2260-E, Proposed Revision to the Energy Resource Recovery Account, Related to the Agreement Between Mono Power Company and UOS Energy, LLC
- Advice 2259-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month September 2008
- Advice 2258-E, Proposed Changes to the California Solar Initiative Program Handbook Conforming to the Final Performance Data Provider Protocol
Advice 2258-E approved through Resolution E-4205 on November 6, 2008 Commission Conference Hearing
- Advice 2254-E, Modifications to the Direct Access and Other Service Fees in Schedules ESP-DSF and CC-DSF, and Modifications to Preliminary Statement, Part N
- Advice 2251-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month August 2008
- Advice 2250-E, Submission of Bilateral Contract Between Southern California Edison Company and The Metropolitan Water District of Southern California for Procurement of Renewable Energy
Effective 09/04/2008 by Resolution E-4186.
- Advice 2248-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Laguna Bell-Bandini-Refuse-Vail 66 Kilovolt (kV), Laguna Bell-Newmark-Vail 66 kV and Laguna Bell-Vail 66 kV Subtransmission Line Rebuild Project
- Advice 2247-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month July 2008
- Advice 2246-E, Southern California Edison Company's 2006 Long-Term Procurement Plan Compliance Filing
Approved by Resolution E-4185.
- Advice 2244-E, Establishment of Tariffs and Contracts for Purchase of Eligible Renewable Generation From Small Renewable Generators
- Advice 2243-E, Revisions to Tariffs in Accordance With Decision 08-03-017 - Third Party Dispatchable Demand Response Contracts
- Advice 2242-E, Disposition of Unencumbered Renewable Fund Refunds and 2008 Renewable Funding Over-Collections in Compliance with Senate Bill 1036 and Resolution E-4160
- Advice 2241-E, Establishment of the Long-Term Procurement Plan Technical Assistance Memorandum Account (LTAMA) in Compliance with Decision 07-12-052
- Advice 2240-E, Adjustment of Existing Income Limitations for California Alternate Rates for Energy and Family Energy Rate Assistance and Modification of Applicable Forms
- Advice 2238-E, Modification of Resolution E-4013 to Remove JPA Liability Provision in Community Choice Aggregation (CCA) Service Agreement
- Advice 2237-E, Procurement Plan Compliance Report: First Quarter 2008
- Advice 2236-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month June 2008
- Advice 2235-E, Establishment of Clean Technology Generation Balancing Account, Carbon Sequestration Evaluation Memorandum Account, and Clean Hydrogen Power Generation Plant Feasibility Memorandum Account in Compliance With Decision 08-04-038
- Advice 2231-E-A, Modification of Rule 18, Supply to Separate Premises and Use By Others, to Allow Submetering for Cold-Ironing Loads
- Advice 2229-E, Tariff Revisions Necessary to Set Forth the 2008 Public Goods Target Funding Levels and the 2008 Procurement Energy Efficiency Program Funding Levels
- Advice 2228-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month May 2008 of Southern California Edison Company
- Advice 2226-E, Request to Establish the Solar Photovoltaic Program Memorandum Account
Approved by Resolution E-4182.
- Advice 2225-E, Implementation of Consolidated Revenue Requirement and Rate Change in Accordance With Decision No. 08-03-019
- Advice 2224-E, Modification to CCA Notification and Open Season Requirements and CCA Liability for Forecasting Errors
- Advice 2223-E, Demand Response Tariff and Program Amendments
- Advice 2222-E, Modify Existing Net Energy Metering Tariffs to Allow Participation by Community Choice Aggregation Customers
- Advice 2221-E, Update to the Transmission Access Charge Balancing Account Adjustment Rate
- Advice 2220-E, Implementation of the Transmission Rates Authorized by the Federal Energy Regulatory Commission in Docket No. ER08-375-000
- Advice 2219-E, Disposition of the December 31, 2007 Balance Recorded in the Family Electric Rate Assistance Balancing Account
- Advice 2218-E, Late Payment Charge Revenue Balancing Account Annual Balance Transfer to the Base Revenue Requirement Balancing Account in Compliance With Decision 04-07-022 and Decision 06-05-016
- Advice 2217-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month April 2008
- Advice 2216-E, Tariff Revisions to Reflect a Decrease in Income Tax Component of Contribution Tax Factor
- Advice 2215-E, SONGS 2&3 Refueling and Maintenance Outage Report for 2007
- Advice 2214-E, Disposition of the December 31, 2007 Balance Recorded in the Quarterly Compliance Filings Audit Expense Memorandum Account
- Advice 2213-E, Modification of SCE's Existing Residential New Construction Program Incorporating Energy Efficiency Requirements for the California Energy Commission's New Solar Homes Partnership; and Reduction to Overall Budget
- Advice 2212-E-A, Supplement to Advice 2212-E, Recovery of California Solar Initiative Program Costs From Residential Customers With Usage Up to 130% of Baseline Quantities
- Advice 2211-E, California Public Utilities Commission Opinion Granting Approval Under Public Utilities Code Section 851 for Conveyance of a Lease by SCE to Dillon Wind, LLC, on Several Transmission Rights-of-Way in Palm Springs and Unincorporated Riverside County
- Advice 2210-E, Submission of Southern California Edison Company's Eleventh Gas Supply Plan for the State of California Department of Water Resources Tolling Agreements Pursuant to D.03-04-029
- Advice 2209-E, Disposition of the December 31, 2007 Electric Deferred Refund Account Balance
- Advice 2208-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month March 2008
- Advice 2207-E, Procurement Plan Compliance Report: Fourth Quarter 2007
- Advice 2206-E, Demand Response Tariff Clean-Up Filing
- Advice 2205-E, Statewide Pricing Pilot Advanced Metering and Demand Response Memorandum Account (AMDRMA) Annual Balance Transfer to the Energy Resource Recovery Account in Compliance With Decision 03-03-036
- Advice 2204-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Moorpark Substation Capacity Increase and Related 66 kV Subtransmission Line Project
- Advice 2203-E, Submission of Contracts for Procurement of Renewable Energy Resulting From Bilateral Negotiations
Effective 09/18/2008 by Resolution E-4159.
- Advice 2202-E, Withdrawal of Two Regulatory Accounts and Revision to the Base Revenue Requirement Balancing Account in Accordance With Decision 07-12-027
- Advice 2201-E, Submission of Bilateral Letter Agreements for Procurement of Renewable Energy
Effective 10/16/08 by Resolution E-4158.
- Advice 2199-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month February 2008
- Advice 2197-E, Continuation of Southern California Edison Company's Circuit Saver Pilot Through the End of Calendar Year 2008
- Advice 2196-E, 2008 Cost of Capital Compliance Advice Filing Pursuant to D.07-12-049
- Advice 2195-E, Implementation of the 2008 California Department of Water Resources (DWR) Power and Bond Charges in Accordance With Decision 07-12-030
- Advice 2194-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Orange County Sanitation District Plant 1, 66/12 kV SCE Orcosan Substation Project
- Advice 2192-E, Request for Approval to Continue Energy Assistance Fund Rate Relief Program
- Advice 2191-E, ACRA/RCRA Compliance Advice Letter
- Advice 2190-E, Annual 1.5 Percent Increase to Schedule TOU-PA-ICE in Compliance With Decision No. 05-06-016
- Advice 2189-E, Approval of O.L.S. Energy-Camarillo Power Purchase Amendment, California State University Channel Islands Absolving Service Agreement and Rule 9 and Rule 16 Deviation
Effective 6/26/08 by Resolution E-4175.
- Advice 2188-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month January 2008
- Advice 2187-E, Recovery of Removal and Disposal Costs for the Original SONGS Steam Generators Pursuant to D.05-12-040
- Advice 2186-E, Proposed California Solar Initiative Handbook Revision Designed to Clarify the Maximum System Sizing Requirement
- Advice 2185-E, Proposed California Solar Initiative Handbook Revisions Designed to Streamline the Application Process
- Advice 2184-E-A, Notice of SCE's ERRA Trigger Point and AB 57 Threshold Self-Correction in Compliance With Decision 06-06-051
- Advice 2183-E, Extension of Southern California Edison Company's Authority to Use the Revised Local Area Reliability Unit Commitment and Dispatch Procedure and to Use the California Independent System Operator's Procedure M-438 Previously Approved by the Commission
- Advice 2182-E, Revisions to SCE's Transmission Revenue Balancing Account Adjustment and Reliability Services Balancing Account Adjustment Rates
- Advice 2181-E, Modification to Preliminary Statement Part ZZ, Energy Resource Recovery Account (ERRA) to Include Sulfur Dioxide Emission Allowances and Derivatives Pursuant to Resolution E-4112
- Advice 2180-E, Modification to Preliminary Statement Part ZZ, Energy Resource Recovery Account, Pursuant to Resolution E-4117
- Advice 2178-E, Confirmation of SCE's Nominee to the Committees of Its Nuclear Decommissioning Trust Funds
- Advice 2177-E, Revision to Rule 2, Description of Service, and Rule 15, Distribution Line Extensions and Assocated Contracts Pursuant to Decision 07-07-019
- Advice 2176-E, 2008 General Rate Case Post Test Year Revenue Requirement in Accordance with Decision 06-05-016
- Advice 2175-E, Tariff Modifications to Schedule I-6, Time-Of-Use General Service Large Interruptible, and Schedule TOU-BIP, Time-Of-Use Base Interruptible Program, Pursuant to SCE's 2006 General Rate Case Settlement Agreement, as Authorized in D.06 06 067
- Advice 2174-E, Request for continuation and modification of Southern California Edison Companys Auto DR Program for 2008
- Advice 2173-E, Year-Ahead Resource Adequacy Compliance Filing for Compliance Year 2008 of Southern California Edison Company
- Advice 2172-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month December 2007
- Advice 2171-E, Procurement Plan Compliance Report: Third Quarter 2007
- Advice 2170-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Purewater 115 kV Substation Project
- Advice 2168-E, Modification of Seasonal Definitions to Align With Calendar Months
- Advice 2167-E, Communications of Sothern California Edison Company's Tariff Sheet Numbering System Pursuant to Decision 07-01-024 and General Rule 8.4.3
- Advice 2166-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month November 2007 of Southern California Edison Company
- Advice 2165-E, Modifications to Rate Schedules Economic Development Rate (EDR)Attraction, EDR Expansion, EDR Rate Retention and Filed Forms EDR Attraction Agreement, EDR Rate Expansion Agreement and EDR Rentention Agreement Pursuant to D.07-09-016
- Advice 2164-E, Advanced Metering Infrastructure Memorandum Account (AMIMA) Balance Transfer to the Advanced Metering Infrastructure Balancing Account (AMIBA)in Compliance With Decision 07-07-042
- Advice 2163-E, Preliminary Local Resource Adequacy (Local RA) Filing of Southern California Edison Company for Compliance Year 2008
- Advice 2162-E, Clarification of Domestic Multifamily Accommodations Eligibility for the California Alternate Rates for Energy Discount
- Advice 2161-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Santa Clara-Colonia-Procgen 66kV Subransmission Line Reconductor Project
- Advice 2160-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Antelope 66kV Subtransmission System Upgrades and Reconductoring Project
- Advice 2159-E, Elimination of Historical Procurement Charge
- Advice 2157-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month October 2007 of Southern California Edison Company
- Advice 2156-E, Modifications to SCE Electric Rate Schedule I-6, Time-Of-Use General Service-Large- Interruptible (I-6), Schedule TOU-BIP, Time-Of-Use-General Service Base Interruptible Program (TOU-BIP) and Schedule Agricultural and Pumping-Interruptible (AP-I).
- Advice 2155-E, Modification of Preliminary Statement, Part N.30, Rate Reduction Bond (RRB) Memorandum Account
- Advice 2154-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Valley-Sun City 115 kV Subtransmission Line Reconductor Project
- Advice 2153-E, Anniversary Trust Transfer Amount True-Up Mechanism
- Advice 2152-E, Reinstatement of Schedule RTP-2 With Modifications to Expand Data Collection Source for Temperature Data
- Advice 2151-E, Request to Modify the Advanced Metering Infrastructure Memorandum Account (AMIMA) to Include Edison SmartConnectTM Phase II and Phase III Expenditures
- Advice 2150-E, Correction to Form 14-687, Application and Contract for Electric Service for Schedule WTR (Wireless Technology Rate), in Compliance With Decision 07-01-038
- Advice 2149-E, Update to the Advanced Metering Infrastructure Balancing Account (AMIBA) in Compliance With Decision No. 07-07-042
- Advice 2147-E, Submission of Southern Californa Edison Company's Tenth Gas Supply Plan for the State of Californa Department of Water Resources Tolling Agreements Pursuant to D.03-04-029
- Advice 2146-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month September 2007
- Advice 2145-E-A, Supplement to Advice 2145-E ("Request for an Amendment to SCE's AB 57 Procurement Plan - Additional Brokerage and Exchange")
- Advice 2144-E, Procurement Plan Compliance Report: Second Quarter 2007
- Advice 2143-E-C, Supplement to Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
- Advice 2143-E-B, Second Supplement to Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
California Sunrise and LACSD contracts effective May 29, 2008 by Resolution E-4125.
Granite Wind contract effective July 10, 2008 by Resolution E-4168.
Advice 2143-E-C withdraws the Baja Wind contract from consideration.
- Advice 2143-E-A, Supplement to Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
California Sunrise and LACSD contracts effective May 29, 2008 by Resolution E-4125.
Granite Wind contract effective July 10, 2008 by Resolution E-4168.
Advice 2143-E-C withdraws the Baja Wind contract from consideration.
- Advice 2143-E, Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
California Sunrise and LACSD contracts effective May 29, 2008 by Resolution E-4125.
Granite Wind contract effective July 10, 2008 by Resolution E-4168.
Advice 2143-E-C withdraws the Baja Wind contract from consideration.
- Advice 2142-E, Amendment to SCE's Assembly Bill 57 Procurement Plan to enable SCE's procurement of Long Term Congestion Revenue Rights
- Advice 2141-E, Amendment to SCE's Assembly Bill 57 Procurement Plan to clarify the upfront achievable standards for the procurement of Congestion Revenue Rights
- Advice 2140-E, Revisions to Schedule CGDL-CRS Customer Generation Departing Load-Cost Responsibility Surcharge and Preliminary Statement, Part W
- Advice 2139-E, Modify SCE Preliminary Statement Part AA, CARE Balancing Account; Part FF, Public Purpose Programs Adjmt Mechanism; and Part HH, LIEE Program Adjmt Mechanism in Accordance with D.07-06-004, Granting Petition to Modifiy D.06-12-038
- Advice 2138-E-A, Supplement to Advice Letter for Proposed California Solar Initiative Handbook Revisions Designed to Streamline the Application Process
- Advice 2137-E-B, Second Supplement to Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
- Advice 2137-E-A, Supplement to Submission of Contracts for Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
- Advice 2137-E, Submission Of Contracts For Procurement of Renewable Energy From SCE's 2006 Renewables Portfolio Standard Solicitation
- Advice 2135-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month August 2007
- Advice 2134-E, Update of Public Utilities Commission Reimbursement Fee for Fiscal Year 2007-08
- Advice 2133-E, Request for Amendment of SCE's Assembly Bill 57 Procurement Plan to Include Sulfur Dioxide Emission Allowances and Related Products
- Advice 2132-E-A, Request for Establishment of a New Generation Memorandum Account
- Advice 2130-E, Proposed Modification to the CSI Handbook for Non-PV Solar Thermal Applications
- Advice 2129-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month July 2007
- Advice 2128-E, Tariff Changes Required to Remove California Consumer Power and Conservation Financing Authority Demand Reserves Partnership Program Language, in Compliance With Resolution E-4020
- Advice 2127-E-A, Supplement to Advice 2127-E, Establishment of Schedule Wi-Fi-1 and Associated Agreement to Provide Unmetered Electric Service for the Attachment of Wi-Fi Devices to Southern California Edison Company (SCE-Owned Streetlights
- Advice 2127-E, Establishment of Schedule Wi-Fi-1 and Associated Agreement to Provide Unmetered Electric Service for the Attachment of Wi-Fi Devices to SCE-Owned Streetlights
- Advice 2126-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, New Saugus-Newhall #3 66kV Subtransmission Line
- Advice 2125-E, Adjustment of Existing Income Limitations for California Alternate Rates for Energy and Family Energy Rate Assistance and Modification of Applicable Forms
- Advice 2124-E, California Public Utilities Commission Opinion Granting Approval Under Public Utilities Code Section 851 for Conveyance of a Lease by Southern California Edison Company to RHC Communities, LLC, on the Eagle Rock-Sylmar Right of Way
- Advice 2122-E, Modify Preliminary Statement, Part YY, Base Revenue Requirement Balancing Account (BRRBA) to Recover Incentives Paid to Aggregators Eligible for Service On Schedule Time-Of-Use Base Interruptible Program (TOU-BIP)
- Advice 2121-E, Revisions to Relect Changes to Reactive Power Designations in Various Rate Schedules
- Advice 2120-E, Procurement Plan Compliance Report: First Quarter 2007
- Advice 2119-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month June 2007 of Southern California Edison Company
- Advice 2118-E, Formatting and Text Revisions to Schedule CC-DSF, Customer Choice Discretionary Service Fees, Form 14-683, SCE Cost Manager Service Agreement, and Form 14-748, SCE Bill Manager Service Agreement
- Advice 2117-E-A, Modification of Preliminary Statement, Part ZZ, Energy Resource Recovery Account (ERRA)
- Advice 2116-E, Modifications to PEAK Plus Pilot Program to Enhance Recruitment, in Compliance with Decision 06-03-024; Replacing Experimental Schedule Time-Of-Use Domestic PEAK Plus Pilot (TOU D PPP) with Experimental Schedule PEAK Plus Pilot (PPP)
- Advice 2115-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month May 2007
- Advice 2114-E, Newly Designed Bill Formats and Establishment of an Optional Simplified Bill Format
- Advice 2113-E, Tariff Revisions Necessary to Set Forth the 2007 Public Goods Target Funding Levels and the 2007 Procurement Energy Efficiency Program Funding Levels
- Advice 2112-E, Tariff Revisions to Update SCE's ERRA Trigger Point and AB 57 Threshold Amounts
- Advice 2111-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Rancho Vista 500/220 kV Substation Project
- Advice 2108-E, Revisions to SCE's Rate Schedules to Update the Transmission Access Charge Balancing Account Adjustment Rate
- Advice 2107-E, Late Payment Charge Revenue Balancing Account Annual Balance Transfer to the Base Revenue Requirement Balancing Account in Compliance With Decision 04-07-022 and Decision 06-05-016
- Advice 2106-E-A, Submissions of Proposal for Permanent Load Shifting Program for Summer 2008 in Compliance with Decision 06-11-049 and Resolution E-4098
- Advice 2105-E-A, Response to Energy Division Request Regarding Southern California Edison Company's August 2006, March 2007, and April 2007 Month-Ahead Resource Adequacy Compliance Filings
- Advice 2104-E, Request for Commission Authorization to Enhance the 2006 Energy Assistance Fund Rate Relief Program to Allow Residential Customers Impacted by the January Freeze to Receive Additional Utility Payment Assistance
- Advice 2103-E, SONGS 2&3 Refueling and Maintenance Outage Report for 2006
- Advice 2102-E, Revision to SCE's Preliminary Statement, Part YY, Base Revenue Requirement Balancing Account, and the Customer Application - Citrus/Agricultural Growers Utility Bill Deferral Program, Forms 14-499 and 14-499-1, Pursuant to Resolution E-4065
- Advice 2101-E, Implementation of Consolidated Revenue Requirement and Rate Change in Accordance With Decision No. 07-01-038
- Advice 2100-E , Extension and Modification of the Southern California Edison Company's Circuit Saver Pilot Through 2007
- Advice 2099-E, Submission of Southern California Edison Company's Ninth Gas Supply Plan for the State of California Department of Water Resources Tolling Agreements Pursuant to Decision 03-04-029
- Advice 2098-E, Disposition of the December 31, 2006 Balance Recorded in the Quarterly Compliance Filings Audit Expense Memorandum Account
- Advice 2097-E, Statewide Pricing Pilot Advanced Metering and Demand Response Memorandum Account (AMDRMA) Annual Balance Transfer to the Energy Resource Recovery Account in Compliance With Decision 03-03-036
- Advice 2096-E-B, Response to Energy Division Request Regarding Southern California Edison Company?s January 2007, February 2007, and March 2007 Month-Ahead Resource Adequacy Compliance Filings
- Advice 2095-E, Disposition of the December 31, 2006 Balance Recorded in the Family Electric Rate Assistance Balancing Account
- Advice 2094-E, Disposition of the December 31, 2006 Electric Deferred Refund Account Balance
- Advice 2093-E, Procurement Plan Compliance Report: Fourth Quarter 2006
- Advice 2092-E, Modification to SCE's Nuclear Decommissioning Trust Fund Revenue Requirement in Accordance With Decision Nos. 07-01-003 and 06-11-025
- Advice 2091-E, Southern California Edison Company's Request for the Establishment of a Market Redesign and Technology Upgrade Memorandum Account
- Advice 2090-E-A, Supplemental Advice Modification of Prelim Statmnts Part U CA Solar Initiative Program Balancing Acct.,Prelim Statement N.3 Self-Gen Program Incremental Cost Memo Acct, Net Energy Metering and Generating Facility Intercon Agrmnt,in Accord w/D.06-12-033
- Advice 2089-E, Proposed Revision to the Energy Resource Recovery Account, and to Request Commission Approval of an Agreement Between Mono Power Company and the Utah Oil Sands, Inc.
- Advice 2088-E, Coordinated Training Plan for Expected Performance Based Buydown Site Inspectors in Compliance with D.06-08-028
- Advice 2087-E, Inclusion of Standby Agreement Costs in Southern California Edison Company's (SCE) Energy Resource Recovery Account (ERRA) Balancing Account
- Advice 2086-E, Transfer of Performance Test Monitoring From the Department of Water Resources (DWR) to Southern California Edison Company Consistent With the Operating Order Between DWR and SCE
- Advice 2085-E, Request Authority to Establish a Department of Energy Litigation Memorandum Account
- Advice 2084-E-A, Response to Energy Division Request Regarding Southern California Edison Company?s January 2007, February 2007, and March 2007 Month-Ahead Resource Adequacy Compliance Filings
- Advice 2083-E, Submission of SCE's Implementation Plan for the 2007 Auto DR Program
- Advice 2082-E, Semi-Annual Filing Regarding Service Provider List Pursuant to Affiliate Transaction Rule IV.C.2
- Advice 2081-E, Affiliate Transactions Compliance Plan - 2006 Update (CP06, Effective December 2006)
- Advice 2080-E, Implementation of the 2007 California Department Water of Resources (DWR) Power and Bond Charges in Accordance with Decision 06-12-035
- Advice 2079-E, Tariff Revisions in Compliance With Decision 06-12-038
- Advice 2078-E, Request Commission Authorization to: (1) Extend the 2006 Energy Assistance Fund Rate Relief Program Through December 31, 2007; and (2) Revise the Energy Resource Recovery Account
- Advice 2077-E, Revisions to Schedule NEM - Net Energy Metering
- Advice 2076-E, Request for an Amendment to SCE's AB 57 Procurement Plan - Updated Energy Limits
- Advice 2075-E-A, Supplement to the Annual Trust Transfer Amount (TTA) True-Up Mechanism Advice Filing
- Advice 2074-E, Order Adopting Changes to 2007 Utility Demand Response Programs Schedule DBP
- Advice 2073-E-A, Supplement to Tariff Revisions to Accommodate the Order Adopting Changes, to 2007 Utility Demand Response Programs, Schedule Time-Of-Use Base Interruptible, in Compliance with D.06-11-049
- Advice 2072-E, Revision to the Base Revenue Requirement Balancing Account Reflecting SCE's Acquisition of the City of Anaheim's Ownership Share of the San Onofre Nuclear Generating Station Units 2 & 3 in Accordance with Decision 06-11-025
- Advice 2071-E, Establishment of Tariffs Implementing Senate Bill 423 to Allow Charitable Organizations to Participate in Direct Access and Obtain Donated Electricity From an Electric Service Provider
- Advice 2070-E, Withdrawal of Nine Regulatory Accounts and Revision to the Energy Resource Recovery Account in Accordance with Decision 06-11-016
- Advice 2069-E, California Public Utilities Commission Opinion Granting Approval Under Public Utilities Code Section 851 for Conveyance of a Lease by Southern California Edison Company to RHC Communities, LLC, on the Center-Del-Amo/Alamitos-Center Right of Way
- Advice 2068-E, Annual 1.5 Percent Increase to Schedule TOU-PA-ICE in Compliance with Decision No. 05-06-016
- Advice 2067-E, Recovery of Removal and Disposal Costs for the Original SONGS Steam Generators Pursuant to Decision 05-12-040
- Advice 2066-E, Establishment of Schedule OBF, On-Bill Financing Program,Form 14-778, On-Bill Financing Loan Agreement, and Modification of Preliminary Statement, Part S, Procurement Energy Efficiency Balancing Account, in Accordance with D.05-09-043
- Advice 2065-E-A, Response to Energy Division Request Regarding Southern California Edison Company?s January 2007, February 2007, and March 2007 Month-Ahead Resource Adequacy Compliance Filings
- Advice 2064-E, ACRA/RCRA Compliance Advice Filing
- Advice 2063-E, Request to Establish the Advanced Metering Infrastructure Memorandum Account (AMIMA)
- Advice 2061-E, Revisions to SCE's Transmission Revenue Balancing Account Adjustment Rate and Reliability Services Balancing Account Adjustment Rates
- Advice 2060-E, Recovery of Rainstorm Costs Granted in Decision 06-10-034
- Advice 2059-E, Request for an Amendment to SCE's AB 57 Procurement Plan- Additional Brokerage
- Advice 2058-E, Newly Designed Bill Format Proposal and Establishment of an Optional Simplified Bill Format
- Advice 2057-E-A, Supplement to Request for Approval to add Day-Of program to the Capacity Bidding Program (CBP) and Associated Agreements
- Advice 2057-E, Request for Approval to add Day-Of program to the Capacity Bidding Program (CBP) and Associated Agreements
- Advice 2056-E, Daylight Saving Time Changes Contemplated Under the Federal Energy Policy Act 2005
- Advice 2055-E, Year-Ahead Resource Adequacy Compliance Filing for Compliance Year 2007 of Southern California Edison Company
- Advice 2054-E-A, Supplement to 2007 General Rate Case (GRC) Post Test Year Revenue Requirement in Accordance With Decision Nos. 06-05-016 and 06-11-025
- Advice 2053-E, Revisions to the Renewable Portfolio Standard Costs Memorandum Account Pursuant to Decision 06-10-050
- Advice 2052-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month December 2006 of Southern California Edison Company
- Advice 2051-E, Procurement Compliance Report: Third Quarter 2006
- Advice 2050-E, Request for an Amendment to SCE's AB 57 Procurement Plan - Risk Plan
- Advice 2049-E, Request for an Amendment to SCE's AB 57 Procurement Plan
- Advice 2048-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Santa Rosa-Tamarisk 115 kV Line Relocation
- Advice 2047-E, Revisions to the Customer Physical Assurance Agreement(Form 14-749)and Schedule S, Standby Service
- Advice 2046-E, Tariff Schedule Revisions, Pursuant to Southern California Edison's 2006 General Rate Case Settlement Agreement, as Authorized in Commission Decision 06-06-067
- Advice 2045-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month November 2006 of Southern California Edison Company
- Advice 2044-E, Preliminary Local Resource Adequacy (Local RA) Filing of SCE for Compliance Year 2007
- Advice 2043-E, Notice of Proposed Construction Project Pursuant to General Order 131-D, Saugus-Elizabeth Lake-Fillmore 66 kV Transmission Line (Commerce Center Project)
- Advice 2042-E, Confirmation of SCE's Nominee to the Committees of Its Nuclear Decommissioning Trust Funds
- Advice 2041-E, Implementation of Schedule LS-2, Rate B
- Advice 2040-E, Request For Approval To Use Up To $10 million of Energy Resource Recovery Account Over-Collection For 2006 Energy Assistance Fund Rate Relief
- Advice 2039-E, Request for an Amendment to SCE's AB 57 Procurement Plan - Clearing Firms
- Advice 2038-E, Financing for Energy Related Services Provided to the Federal Government Under Advice Letter 1358-E
- Advice 2037-E, Month-Ahead Resource Adequacy Compliance Filing for Compliance Month October 2006 of Southern California Edison Company
- Advice 2036-E, Southern California Edison Company's Update to the Transmission Revenue Balancing Account Adjustment Rate
- Advice 2035-E, Submission of Contract for Procurement from Renewable Energy Resource Pursuant to California Renewables Portfolio Standard Program
- Advice 2034-E-A, Supplement to Advice 2034-E, Modifications to the Air Conditioning Cycling Program to Address Electric Reliability Needs in Southern California For Summer 2007
| | | |